Forum quick links
Differences between Baseline and Proposed energy model
CI-v4 EAp2:Minimum energy performanceposted by Irina Lugo on
Hi everyone, sorry if this is a bit obvious, it is my first time working with this type of LEED certification.
Emissions for a District System in the Minimum Perfomance Calculator
Retail-CI-v4.1 EAp2:Minimum Energy Performanceposted by Marc Maso on
Hello, I have a building with a district system for cooling, heating and DHW.
Take into account Renewable Energy production in the close future from the certification
CI-v4 EAp2:Minimum energy performanceposted by Helena Garcia on
Dear GBCI team,
Existing building and extension building in one certification
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Helena Garcia on
In our team we are conducting a study for the construction of an extension of an existing building.
Pilot 132_PROCUREMENT OF LOW CARBON CONSTRUCTION MATERIALS
NC-v4 INc1:Innovationposted by Albert Sagrera on
Good afternoon,
locker roms
Pilot-Credits WEpc147:All-Gender Restroomsposted by Belén Palao on
Dear LEED coach,
based on the All gender restrooms credit option 1 I had a consultation I wanted to make:
Ventilation Warehouses
NC-v4 EQp1:Minimum indoor air quality performanceposted by Helena Garcia on
We are certifing a project with two buildings, the first is an offices, the second is a warehouses to rent in Spain. The question is for the warehouse, this warehouse is not conditioned and the sp
Ventilation in corridors
NC-v4 EQp1:Minimum indoor air quality performanceposted by Luana Jerez on
We are working on an office building 17 meters wide, on one floor, the layout is a 3.5-meter distribution corridor, serving as a division between two rows of offices.
Ratio Windows/Wall in baseline model Table G1.1.1-1
NC-v4.1 EAp2:Minimum Energy Performanceposted by Marc Maso on
Dear Srs, I hace a question about the ratio windows/walls in leed v4.1. Is for a building with two differents uses: 3.117 m2 of office and 13.472m2 of warehouse.