In our team we are conducting a study for the construction of an extension of an existing building.
The property applies for LEED certification for both buildings (existing and expansion). The facilities of both buildings will be connected together.
How can we work this case? someone has encountered a similar situation? Can you perform a single certification?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Mon, 11/13/2023 - 14:09

Here is a link that is helpful in such scenarios: https://www.usgbc.org/leed-tools/rating-system-selection-guidance#:~:text=If%20a%20rating%20system%20is,rating%20system%20should%20be%20used.
  • If a rating system is appropriate for less than 40% of the gross floor area of a LEED project building or space, then that rating system should not be used.
  • If a rating system is appropriate for more than 60% of the gross floor area of a LEED project building or space, then that rating system should be used.
  • If an appropriate rating system falls between 40% and 60% of the gross floor area, project teams must independently assess their situation and decide which rating system is most applicable.

Add new comment