Building's equipment still uncertain

NC-v4 EAc3:Advanced energy metering
posted by  Maria Matos  on 

Hi Marcus, We are working on a building which will have the following uses: offices, laboratory (pharmaceutical), showers and changing facilities, canteen and a smaller bar.

1
Wed Apr 12, 2017, 1:35 pm

Determining compliance

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Tiago e Silva  on 

I’m working on a Project in Portugal, which consists in a 13.400m2 site, with 6000m2 rooftop (harvests rain), 2500m2 green roof, 2735m2 of gardens, 306 m2 of planters and 1840m2 of impermeable pave

1
Tue Mar 29, 2011, 9:07 pm

Baseline HVAC System Type - for laboratories

NC-v4 EAp2:Minimum energy performance
posted by  Carol SR  on 

Hello! I am constructing a building model which spaces are half offices, half laboratories. The HVAC system chosen is system 5 (packaged VAV with reheat) for all building, since it is considered a

1
Wed Nov 30, 2016, 3:51 pm

Single tenant O&M certification on a multitenant building

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Ricardo Sá  on 

LEED O&M 2009 reference guide stated (page xxii) that "certification applies only to whole buildings" and that "the project of a multitenant building must involve at least 90% of the total gros

1
Thu May 26, 2016, 6:34 pm

Exhaustion rates in WC

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Maria Matos  on 

Dear all, I would like to know if it is mandatory to comply with minimum exhaust rates indicated in TTABLE 6-4 Minimum Exhaust Rates from ASHRAE 60.1 -2010.

3
Thu Apr 20, 2017, 3:34 pm

Reflectance

NC-v4 EQc7:Daylight
posted by  Inês Marques  on 

Hi everyone, I'm having trouble finding datasheets with the reflectance values for the project I'm working on.

2
Wed Apr 5, 2017, 3:44 pm

Evidences for thermal comfort in commercial kitchen

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Ricardo Sá  on 

Hello, I'm currently working on a project of a huge office building with a small area for retail and a restaurant.

3
Thu Dec 22, 2016, 9:22 pm

Ecotect Daylight Autonomy and Insolation levels Analysis

NC-v4 EQc7:Daylight
posted by  Greenlab   on 

Hello, I'm trying to answer the V4 BD+C (New Construction and Major Renovation) daylight credit through option 1 (SDA+ASE).

8
Default Avatar
Green Lab
LEEDuser Basic Member
6 thumbs up
Thu Sep 29, 2016, 1:46 pm

Ventilation as Process Load

NC-2009 EAp2:Minimum Energy Performance
posted by  Ricardo Sá  on 

Hi! I'm currently working on a project regarding an office building.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Sep 19, 2016, 4:24 pm

Multiple types of MERV filters for pressure drop adjustment

NC-2009 EAp2:Minimum Energy Performance
posted by  Ricardo Sá  on 

Hi, I have several AHU's that serve a big office building.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Aug 31, 2016, 4:06 pm