internal moking area's for an Airport
NC-v4 EQp2:Environmental tobacco smoke controlposted by Ydo Schuuring on
For an extension of an excisting airport that is possible LEED certified, the client desires interior smoking areas to prevent 'illegal' smoking inside the airport.
Shower Requirement- More than 50% Occupants with Bike Space
CI-v4 LTc4:Bicycle facilitiesposted by Oliver Bate on
Hi,
LED integrated in facade window frame/ MLO lighting zone
NC-v4 SSc6:Light pollution reductionposted by Ilse Dijkstra-Nugteren on
We are working on the LEED V4 certification of a project which will be located at the border of a business park and about 3 kilometers away from highways and an international airport.
Radius
NC-v4 LTc4:Surrounding density and diverse usesposted by Sylvia Renes on
Hi, How does a 1/4 mile radius around the project site from the project boundary looks like?
Rainwater management - Filters
NC-v4 SSc4:Rainwater managementposted by Jorge Mato Rial on
Hello Everyone! I am working in a project, which includes the following types of surfaces: -Impervious roof areas -Garden areas -Impervious vehicle circulation areas -Parking area with green paveme
Pilot credit: No Cooling Tower [ v4 - bc+d)
NC-v4 INc1:Innovationposted by Ydo Schuuring on
Hello, For a project no coolingtowers are used. There for we have the possibility to achieve the Pilot credit No Cooling Tower.
ATES in combination with HP
NC-v4 EAc5:Renewable energy productionposted by Ydo Schuuring on
We would like achieve points for the credit: Renewable Energy Production. The design team is considering an Aquifer Therma Energy Storage (ATES) in combination with a heatpump.
LEED rating system change from CS to NC?
posted by Jeroen Sap on
I am working on a Core&Shell office building project. The owner has not yet found a tenant so we are preparing design documentation for LEED CS.
Is C&S allowed if you are eligible for NC?
posted by Isolda Strom on
We are in the very early stages of a project that is considering LEED certification. Demarcation is still unclear, but it the client is interested in all options.