Forum quick links
Mandatory 18% energy saving after April 2016
NC-2009 EAc1:Optimize Energy Performanceposted by Indochine Engineering VN on
Hi, I just read requirement of EAc1 on USGBC web page, is it true that all LEED New Construction projects registered after 8 April 2016 have to reach 18% - 4 points at minimum.
Baseline for Cold Storage project
NC-2009 EAp2:Minimum Energy Performanceposted by Thu Nguyen on
Hi all experts, My project in Vietnam with major function is Cold Storage, with operational temperature would be -25 degree. Currently, we concern for BASELINE OF ENERGY MODEL.
Motorbike transport
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Melissa Merryweather on
I've checked the ACEEE list and it only includes cars. The main form of transport in Vietnam is a 50cc scooter and it is certainly fuel-efficient.
Solar Energy
NC-2009 EAc2:On-Site Renewable Energyposted by SAMY Chamy on
Dear Al:- Our project have 50 kWp Grid connected solar panel system with out battery back up.
Major Renovation Building Energy Modelling
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Dear All We are currently working on a Major Renovation Building.
Rating system: NC, CI or EBOM?
posted by Melissa Merryweather on
I seem to be posting on this thread constantly! I wish I had a straight-forward LEED project. My current concern is a single university building.
Doing monthly photo report of IAQ management
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Indochine Engineering VN on
Hi, My project is under construction, but just structural work (finalizing substructure and launching superstructure). It is long way to furnishing and MEP work onsite.
FSC Mix cabinet with Recycled content
NC-2009 MRc7:Certified Woodposted by Indochine Engineering VN on
Hi, one kitchen supplier showed me their CoC certificate that says the status of material is FSC Mix and they also confirmed their cabinet products have 25% recycled content.
Biomass for process steam
NC-2009 EAp2:Minimum Energy Performanceposted by Melissa Merryweather on
I am working on a factory that uses process steam, which accounts for about half of the whole energy use.
To what extent we provide Tenant fitout
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Indochine Engineering VN on
Hi, my project has 19 office floors, and one floor is already fitted out by tenant. So the rest 18 floors are empty - open office.