Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Private shuttle buses

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Hanh Truong  on 

Dear all, I would like to use LI ID# 100001163 : "Shuttle buses should provide direct access to transit facilities within 2 miles of the project site, approximately a 5-10 minute drive, and must b

1
Thu Aug 10, 2017, 12:08 pm

Lighting control in Tenant space

CS-2009 EAp2:Minimum Energy Performance
posted by  Indochine Engineering VN  on 

Hi, I have an open office, restaurant, apartment for rent in the mixed use building project. Im confused with lighting control mandatory section 9.4 ASHRAE.

1
Tue Jun 16, 2015, 1:45 pm

All water reduction through recycling

NC-2009 WEc3:Water Use Reduction
posted by  Melissa Merryweather  on 

I'm just curious if anyone has experience not even achieving the basic 20% reduction with the sanitary ware, but then achieving innovation points on both WEc2 and WEc3 (and of course the regional p

0

ASHRAE 55 - apartment

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Indochine Engineering VN  on 

My project has apartments and penthouses on the top. Engineers design VRF with thermostat and residents can control their comfort thermally.

1
Fri Dec 11, 2015, 9:50 pm

Modeling OA with Demand control ventilation

CS-2009 EAp2:Minimum Energy Performance
posted by  Indochine Engineering VN  on 

Hi, I have demand control ventilation for every AHU.

1
Thu Sep 25, 2014, 1:18 pm

Historic District

NC-v4 LTc3:High priority site
posted by  Indochine Engineering VN  on 

Hi, my project located in an old district where has a lot of old architecture buildings around with tourist.

1
Tue Jul 18, 2017, 5:14 pm

Exterior windows and doors?

NC-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elements
posted by  Erin Holdenried  on 

I assume exterior window and doors are included in this credit, as they are excluded from MRc1.1?

1
Thu Feb 23, 2017, 2:50 pm

62MZ calc for critical zones

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Indochine Engineering VN  on 

Hi, my project has PAU to supply OA through VAVs to AHUs, which then supply air to office spaces. This PAU also supplies OA through CAVs to lift lobbies and FCUs recirculate the air there.

0

Energy Modeling for Support buildings

NC-2009 EAp2:Minimum Energy Performance
posted by  SAMY Chamy  on 

Dear All:- Recently we submit the factory building to LEED as Individual project certification not for group certification.

1
Fri May 13, 2016, 3:00 pm

Energy modeling for LEED BD+C: Core & Shell

NC-v4 EAp2:Minimum energy performance
posted by  Hanh Truong  on 

Dear all, We have a project targeting LEED BD+C: Core & Shell. My question is how to model whole-building energy simulation?

2
Tue Aug 1, 2017, 3:00 pm