Forum quick links
Open space definition
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by sompoche sirichote on
My project is in the industrial area which allows building footprint not exceeding 66% of total site area.
Platinum Certification
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Muzammal Abbas LEED AP (BD+C) on
We had submitted one of our LEED EBOM project final review and received 72 points. We had accepted the review and received Certified Gold Level.
Building Orientation
NC-v4 EAp2:Minimum energy performanceposted by Muzamil Rafique on
Hello Marcus, 1.My project orientation on NW,NE,SW and SE.
Project Registration
NC-v4 EAp2:Minimum energy performanceposted by Muzammal Abbas LEED AP (BD+C) on
Hi, We have project in Pakistan and we had done all measures for LEED certification, but due to some client personal reasons we were not able to register this project with USGBC and now after 1.5
Fresh air supply using Cooling pad in Production area
NC-2009 IEQp1:Minimum IAQ Performanceposted by SAMY Chamy on
Dear all Our project is single storied sewing factory in production area we have large size Exhaust fans in one side and opposite side of exhaust fan have cooling pad Now the issue is we can't p
V3 project Minimum Indoor Air Quality Performance Pre-requisite.
CI-2009 IEQp1:Minimum IAQ Performanceposted by sajjad Malik on
I have submitted minimum indoor air quality performance pre-requisite for final design review and reviewer ask me for a narrative but I do not find any option for upload the narrative or any option
Project boundary issues
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Muneeb Haider on
I am doing a project in Lahore, Pakistan for the British Council. It is a 6,000sf library located on a 50,000sf site.
Documents Required For pre-certification for LEED V4 Core Shell
CS-v4 MPR1:Must be in a permanent location on existing landposted by Aqrab Ali Rana on
I have project of apartment in Pakistan, What are documents required for all credits actually??Do I have to submit all documents as I submit for preliminary review or just to tell the strategies an