EAp1 Minimum Energy Performance Calculator
NC-2009 EAp2:Minimum energy performanceposted by sriram tetali on
Hi, Please help us in solving the Errors in the Minimum Energy Performance Calculator. Project Registered under => LEED NC BD+C -v3 (2009) • Macros are not getting enabled • Shading & Fenes
Equation2: Monthly harvested rainwater volume. (v4)
NC-v4 WEc1:Outdoor water use reductionposted by deepak cherukumilli on
Reference guide v4 BD+C:Page290: STEP 5: I didnot understand why a 0.15 is used in this equation. Is this for any kind of losses in the rain water storage process.
Laundry Chemical
EBOM-v4 EQc7:Green cleaning - products and materialsposted by VISHESH AGARWAL on
Cleaning and Degreasing- CCD-110 is this credit include the laundry cleaning product come under the cleaning and degreasing category.
100% irrigation requirement met through treated waste water
NC-2009 WEc1:Water efficient landscapingposted by Yusuf Turab on
I find the credit language very confusing.
Broken Bricks, Tiles and waste materials
NC-2009 MRc3:Materials reuseposted by Yusuf Turab on
We have used large quantities of waste materials procured from manufacturers. We have procured waste material like broken bricks form the brick manufacturer.
Re-use of excavated rocks onsite for construction.
NC-2009 MRc2:Construction waste managementposted by Palak Varshney on
Project Location: India. The project construction site has rock bed. These rock are excavated, broken and re-used in construction on-site.
Pump Room, STP Room & Guard Room Within LEED Boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Aswin M on
We have a factory project to be registered under LEED New Construction.
Idle energy rate for energy star equivalency calculations
CI-2009 EAc1.4:Optimize energy performance - equipment and appliancesposted by Shuchita Gupta on
Hi , We have an interior project specifying kitchen appliances like electric fryer , which are not energy star labelled so we are checking the equivalency for which we require idle rate and cook
Method to Achieve Thermal - Comfort for Ventilated Area
NC-2009 IEQc7.1:Thermal comfort - designposted by SAMY Chamy on
Hai Everyone:- Our project is sewing factory It is not fully conditioned (A/C & Ventilation) 1.A/c for Office area 2.Fans (Exhaust, Fresh air, HVLS fans) for Production area We use HVLS fan
Construction Activity and Pollution Prevention
NC-2009 SSp1:Construction activity pollution preventionposted by JP Rout on
We have Project intending to be registered under LEED 2009 BD+C for major renovations.