Equation2: Monthly harvested rainwater volume. (v4)

NC-v4 WEc1:Outdoor water use reduction
posted by  deepak cherukumilli  on 

Reference guide v4 BD+C:Page290: STEP 5: I didnot understand why a 0.15 is used in this equation. Is this for any kind of losses in the rain water storage process.

2
Sites Technical Specialist, LEED
USGBC
LEEDuser Premium Member
47 thumbs up
Wed Oct 19, 2016, 9:13 pm

Laundry Chemical

EBOM-v4 EQc7:Green cleaning - products and materials
posted by  VISHESH AGARWAL  on 

Cleaning and Degreasing- CCD-110 is this credit include the laundry cleaning product come under the cleaning and degreasing category.

2
Wed Oct 5, 2016, 5:47 pm
2
LEED Fellow 2011, Principal
Kath Williams + Associates
LEEDuser Premium Member
103 thumbs up
Wed Aug 17, 2016, 5:46 pm

Broken Bricks, Tiles and waste materials

NC-2009 MRc3:Materials Reuse
posted by  Yusuf Turab  on 

We have used large quantities of waste materials procured from manufacturers. We have procured waste material like broken bricks form the brick manufacturer.

3
Managing Director
InHabit & BuildScape
LEEDuser Basic Member
18 thumbs up
Mon Aug 8, 2016, 1:05 pm

Re-use of excavated rocks onsite for construction.

NC-2009 MRc2:Construction Waste Management
posted by  Palak Varshney  on 

Project Location: India. The project construction site has rock bed. These rock are excavated, broken and re-used in construction on-site.

2
Default Avatar
LEEDuser Expert
472 thumbs up
Mon Aug 1, 2016, 9:33 am

Pump Room, STP Room & Guard Room Within LEED Boundary

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Aswin M  on 

We have a factory project to be registered under LEED New Construction.

3
Fri Feb 5, 2016, 9:41 am

Idle energy rate for energy star equivalency calculations

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Shuchita Gupta  on 

Hi , We have an interior project specifying kitchen appliances like electric fryer , which are not energy star labelled so we are checking the equivalency for which we require idle rate and cook

2
Tue Jan 26, 2016, 1:09 pm

Method to Achieve Thermal - Comfort for Ventilated Area

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  SAMY Chamy  on 

Hai Everyone:- Our project is sewing factory It is not fully conditioned (A/C & Ventilation) 1.A/c for Office area 2.Fans (Exhaust, Fresh air, HVLS fans) for Production area We use HVLS fan

3
Enginneer
T&T Green
LEEDuser Basic Member
9 thumbs up
Mon Jan 25, 2016, 3:44 pm

Construction Activity and Pollution Prevention

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  JP Rout  on 

We have Project intending to be registered under LEED 2009 BD+C for major renovations.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Jan 25, 2016, 9:13 am

Need Registration guidance for an upcoming Hospital campus

LEED Guidance for Campuses and Multiple Buildings
posted by  Neha Singhal  on 

We have a Medical institution coming up at Faridabad (India), which contains various types of building, where the construction would be carried out simultaneously for all the blocks.

3
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Sun Jan 17, 2016, 4:51 pm