EA Cr 1.5

Retail-CI-v2009 EAc1.5:Optimize energy performance - building envelope
posted by  balasubramaniam kg  on 

We have a retail commercial project in a leed certified building that is an air port. we want to know for the UA calculation only requires to use the project areas or all the building areas.

0

Purchasing- Ongoing

EBOM-v4 MRc1:Purchasing - ongoing
posted by  VISHESH AGARWAL  on 

what percentage of documentation should be required in local food material (100 miles).

1
Wed Aug 31, 2016, 10:04 pm
1
Sat Aug 26, 2017, 6:50 pm

District Co generation Plantby

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  satheesh M  on 

Hi, The building is catered by own chiller plant located in the building & building owned DES Cogeneration plant for the space cooling.

1
Tue Nov 10, 2015, 11:50 pm

Basic Doubts

Data-Centers-NC-v4 EAp2:Minimum energy performance
posted by  Rathnashree Bharadwaj  on 

I have a few basic Doubts regarding what is stated in the reference guide. Please clarify. 1.

1
Tue Apr 19, 2016, 2:57 pm

Cleaning Chemicals

Hospitality-EBOM-v4 EQc7:Green cleaning - products and materials
posted by  VISHESH AGARWAL  on 

Is laundary and kitchen cleaning chemicals included in LEED V4.

1
Tue Jan 17, 2017, 8:52 pm

Ongoing purchasing and waste policy

EBOM-v4 MRp1:Ongoing purchasing and waste policy
posted by  VISHESH AGARWAL  on 

Thanks in advance can any share the link of LEED V4 Ongoing purchasing and waste policy Tempelate.

1
Fri Oct 21, 2016, 10:29 pm

Furniture heights

CI-v4 EQc8:Quality views
posted by  Subramaniam Chandrasekaran  on 

exactly same as the below mentioned point; for a project, the interior designer wants to know whether they have to go with 1050 mm or 1100 mm of workstation height; this clarification answers; but

1
Mon Jul 10, 2017, 12:43 pm

HVAC duct insulation adhesive

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Gaura Saxena  on 

Hi For a project using an adhesive for HVAC duct insulation, what should be the VOC limit that should be followed for since the standards does not mention any value directly for the insulation adhe

1
Tue Sep 1, 2015, 12:17 am

BAS

EBOM-2009 EAc3.1:Performance Measurement—Building Automation System
posted by  VISHESH AGARWAL  on 

Is it necessary to have exterior lighting monitor and control to achieve this credit point. if interior is on BMS, Will i able to take that credit.

1
Tue May 17, 2016, 12:27 pm