Forum quick links
EA Cr 1.5
Retail-CI-v2009 EAc1.5:Optimize energy performance - building envelopeposted by balasubramaniam kg on
We have a retail commercial project in a leed certified building that is an air port. we want to know for the UA calculation only requires to use the project areas or all the building areas.
Purchasing- Ongoing
EBOM-v4 MRc1:Purchasing - ongoingposted by VISHESH AGARWAL on
what percentage of documentation should be required in local food material (100 miles).
Compliance path for demonstrating minimum daily transit trip
CI-v4 LTc3:Access to quality transitposted by Dipti Talwar on
I am working on a project located in India.
District Co generation Plantby
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by satheesh M on
Hi, The building is catered by own chiller plant located in the building & building owned DES Cogeneration plant for the space cooling.
Basic Doubts
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by Rathnashree Bharadwaj on
I have a few basic Doubts regarding what is stated in the reference guide. Please clarify. 1.
Cleaning Chemicals
Hospitality-EBOM-v4 EQc7:Green cleaning - products and materialsposted by VISHESH AGARWAL on
Is laundary and kitchen cleaning chemicals included in LEED V4.
Ongoing purchasing and waste policy
EBOM-v4 MRp1:Ongoing purchasing and waste policyposted by VISHESH AGARWAL on
Thanks in advance can any share the link of LEED V4 Ongoing purchasing and waste policy Tempelate.
Furniture heights
CI-v4 EQc8:Quality viewsposted by Subramaniam Chandrasekaran on
exactly same as the below mentioned point; for a project, the interior designer wants to know whether they have to go with 1050 mm or 1100 mm of workstation height; this clarification answers; but
HVAC duct insulation adhesive
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Gaura Saxena on
Hi For a project using an adhesive for HVAC duct insulation, what should be the VOC limit that should be followed for since the standards does not mention any value directly for the insulation adhe
BAS
EBOM-2009 EAc3.1:Performance Measurement—Building Automation Systemposted by VISHESH AGARWAL on
Is it necessary to have exterior lighting monitor and control to achieve this credit point. if interior is on BMS, Will i able to take that credit.