200 rides per day required for shuttle buses?
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Weidong Luo on
Private shuttles are employed to satisfy SSc4.1 on our project.
Question about ASE study area
NC-v4 EQc7:Daylightposted by Jackie Cheung on
Hello everyone. May I ask 2 questions about this credit? A) Assuming a project go for option 1.
Energy Model for Ice Rink
NC-v4 EAp2:Minimum energy performanceposted by Shenhao Li on
Hello, We have a speed skating oval project. Should the energy used for ice rink modeled as process load? We think this will be the major energy consumption.
Ventilation and filteration for Staircase for Feature 64
posted by Xinrong Zhao on
Hello, Thank you Tristan for adding a WELL discussion to this site. My rpoject is an 18 floor residential project. The staircase is use for Fire exits.
a question about DES option 1
CS-2009 EAc3:Enhanced Commissioningposted by Shenhao Li on
Hello! I have a question about EAc3 for DES system.
BOD and OPR
CI-v4 EAp1:Fundamental commissioning and verificationposted by Erin Rowe on
I am looking at an OPR for a project pursuing this credit, and it is quite high level.
Chilled Beam System Energy Modeling- CS v2009
CS-2009 EAp2:Minimum Energy Performanceposted by Shenhao Li on
Hello Everyone, I have an office project which is designed to use a little compicated HVAC system.
single zone or multi-zone calculation?
NC-2009 IEQp1:Minimum IAQ Performanceposted by Hongyun Zhou on
I have a project, which have two types of system: 1. OA system offering the fresh air to each room, and each room has an individual fan coil unit . 2.
LEED EBOM EAP2 Minimum Energy Effiuciency
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by ABDUL MUTHALIB MOHAMED on
Hi, We are pursuing Option 2B: Energy Baseline including Historical Data for minimum energy efficiency, the weather normalized Energy Use Index from Energy Star Portfolio Manager during performance
some questions about kitchen and toilet vent
CS-2009 EAp2:Minimum Energy Performanceposted by Shenhao Li on
Hello! I had submit a project for cs2009, and got some comments confused. The project is a high rise building consists of retails, restaurants and offices.