Providing clarifications to Design Phase Review
posted by Susannah Goddard on
Our project has just received the Design Phase Review feedback from USGBC and we are now in the process of addressing the issues raised with some of the credits.
Baseline for retail
NC-2009 EAp2:Minimum Energy Performanceposted by Lise Dannesboe on
Hi! I know that there is a baseline for data centers (tool developed in excel), is there also a similar document or any guideline for retail?
Interior Lighting
CS-2009 EAp2:Minimum Energy Performanceposted by Sandra Holmström on
I have a question regarding what lighting that should be modeled as interior lighting in a Core and Shell project.
Hot desks as regularly occupied space?
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Paul Rogers on
Should an area designated for hot desking be included as a regularly occupied area? No single user will spend more than one hour per day at these workstations.
On-site renewable energy
NC-2009 EAp2:Minimum Energy Performanceposted by Lise Dannesboe on
Hi! We are trying to offset as much as possible from our electricity consumption with on-site PV.
Medical gas system - part of fundamental commissioning?
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Veronika Sundberg on
Hello, my qeustion is regarding our medical gas system and if it should be part of the fundamental commissionig for LEED? We will undertake commissioning of the system but would prefer to excluded
LEED Design Review and Final Certification Proceedures
posted by Susannah Goddard on
We are currently working our way through our Design Stage Review comments from USGBC.
WEp1 Exemption?
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Cathal Heneghan on
Hi I am working on a CI 2009 project in Dublin, Ireland. The project is an office TI involving the bottom 3 floors of a 5 floor building.