Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Pilot credit wakable site

CS-v4 INc1:Innovation
posted by  Tobias Berge  on 

We chose to achieve a pilot credit called wakable sites. Unfortunately we discoverad that the credit is closed. We have register the project on LEED online but not registered this specific credit.

1
Sat Sep 9, 2017, 7:04 am

LEED v 4 deadline

Performance Period
posted by  Tobias Berge  on 

We are planning to register a LEED v 4 Core & Shell project on LEED Online.

1
Thu Apr 6, 2017, 10:40 pm

Construction Waste management

NC-2009 MRc2:Construction Waste Management
posted by  Piotr Podhajny  on 

What if you have two buildings each persuing LEED certification both build by the same contractor but two owners. How do you seperate the waste amount from both building?

1
Fri Jul 22, 2016, 4:32 pm

LEED v3 Campus Deadline

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Patrice McVeigh  on 

We are working on a project with 4 office buildings and a multi-storey car park. We are unsure whether to go for campus certification as the project is phased.

1
Fri Nov 18, 2016, 5:20 pm

Control devices required for meeting ASHRAE 55

CS-2009 IEQc7:Thermal Comfort—Design
posted by  Mindaugas Mi  on 

Dear Leeduser.com members. We have a question regarding whether we need these controls for meeting LEED credits under v2009 CS version. - Radiator heating system.

1
Thu Jan 12, 2017, 11:19 pm

Typical TSS measures from Sedum roofing

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Andreas Soederberg  on 

We are planning to have Sedum Roofing, partly to recieve credit 6.1. I have read a lot about vegetated roofing also to pursue credit 6.2.

1
Fri Sep 26, 2014, 1:01 pm

>10% exemption possible?

EBOM-2009 MPR2:Must be a complete, permanent building or space
posted by  Rasita Masalskyte  on 

Hello, Has anyone heard of possibility to exclude >10% of building gross area that is under separate ownership and management? In our case such space makes 14%.

0

Supplementary mechanical ventilation in naturally ventilated

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Michael Smithing  on 

Our project is primarily naturally ventilated and meets the requirements of Section 5.1 in non-core areas.

0

Is it ok to take out charge for changing facilities?

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Maria Glädt  on 

Hi! Our project, an office building, will have the changing facilities adjacent to a gym. The tenant will take out a small charge from the workers for usage of the gym.

1
Wed May 20, 2015, 4:44 pm

Cycle lane between project and Bicycle Network

NC-v4 LTc6:Bicycle facilities
posted by  Alicia Costas Freire  on 

Hello, I have a quick question and I would very much appreciate if someone could assist. I understand from the LEED guidance that there is no requirement for provision of a dedicated cycle lane be

0