Forum quick links
New renewable energy that is not double counted - enough?
NC-2009 EAc6:Green powerposted by Maria Porter on
Another question for another project: The project has purchased shares in a new solar park, Sweden’s biggest when it’s finished.
Is there a Minimum IAQ Performance Calculator based on CEN Standard?
CS-v4 EQp1:Minimum indoor air quality performanceposted by Qidi Jiang on
The Minimum IAQ Performance Calculator provided by USGBC is completely based on ASHRAE Standard.
Verified Construction & Demolition Recycling Rates Pilot
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Juliana Moreira on
I am working on a commercial interiors project in London-UK. The standard for construction waste most commonly used in the UK is the PAS 402.
How wide is the definition of coating?
CI-v4 EQc2:Low emitting materialsposted by Rita Paulo on
Hi everyone.
We are checking the project written material of a LEED V.4. BD+C project in Copenhagen.
Energy Modelling - United Kingdom
NC-v4 EAp2:Minimum energy performanceposted by Fleur Baguley on
Hi, I have a project in the UK. For schemes such as BREEAM we use a SBEM - BRUKL output for the energy credits. Does anyone know if this is compliant to use for LEED as well?
Subway - same as light rail?
NC-v4 LTc5:Access to quality transitposted by Maria Porter on
Hi! Subway stations fall into the second category (800 m/0.5 miles from the project site) right?
Use of a WELL credit as ID?
NC-2009 IDc1:Innovation in Designposted by Devyn Olson Sawyer on
Our team is have been reviewing WELL and are considering completing a WELL credit in our LEED project.
Waste-to-Energy
NC-v4 MRc5:Construction and demolition waste managementposted by Lise Dannesboe on
Hi
Elevators
NC-v4 EAc2:Optimize energy performanceposted by John McCullough on
I have managed to create a rather impressive energy reduction between the baseline and proposed elevators.
EAc1 baseline and proposed systems
NC-v4 EAc2:Optimize energy performanceposted by John McCullough on
The problem I am having is that I have to select a system for the baseline model which is System 7 VAV with Reheat, based on the advise of ASHRAE Table G3.1.1A , however the proposed system for the