Forum quick links
C&S office now with Upgraded Core and Shell Services in Tenancies
CS-v4 EAp2:Minimum energy performanceposted by James Duggan on
Hi, I'm working on an office C&S project. Up until recently the MEP strategy was natural ventilation of all tenancies and for this reason the tenancy was envisaged to be modelled that way
New renewable energy that is not double counted - enough?
NC-2009 EAc6:Green powerposted by Maria Porter on
Another question for another project: The project has purchased shares in a new solar park, Sweden’s biggest when it’s finished.
Is there a Minimum IAQ Performance Calculator based on CEN Standard?
CS-v4 EQp1:Minimum indoor air quality performanceposted by Qidi Jiang on
The Minimum IAQ Performance Calculator provided by USGBC is completely based on ASHRAE Standard.
Verified Construction & Demolition Recycling Rates Pilot
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Juliana Moreira on
I am working on a commercial interiors project in London-UK. The standard for construction waste most commonly used in the UK is the PAS 402.
How wide is the definition of coating?
CI-v4 EQc2:Low-emitting materialsposted by Rita Paulo on
Hi everyone.
We are checking the project written material of a LEED V.4. BD+C project in Copenhagen.
Energy Modelling - United Kingdom
NC-v4 EAp2:Minimum energy performanceposted by Fleur Baguley on
Hi, I have a project in the UK. For schemes such as BREEAM we use a SBEM - BRUKL output for the energy credits. Does anyone know if this is compliant to use for LEED as well?
Subway - same as light rail?
NC-v4 LTc5:Access to quality transitposted by Maria Porter on
Hi! Subway stations fall into the second category (800 m/0.5 miles from the project site) right?
Use of a WELL credit as ID?
NC-2009 IDc1:Innovation in designposted by Devyn Olson Sawyer on
Our team is have been reviewing WELL and are considering completing a WELL credit in our LEED project.
Waste-to-Energy
NC-v4 MRc5:Construction and demolition waste managementposted by Lise Dannesboe on
Hi
Elevators
NC-v4 EAc2:Optimize energy performanceposted by John McCullough on
I have managed to create a rather impressive energy reduction between the baseline and proposed elevators.