Forum quick links
Waling Distance 400 m or 800 m?
CS-v4 LTc5:Access to quality transitposted by Stephan Zweig on
Dear all,
1) Does subway station as light rail station count? So there applies the limit of 800 m?
Switch Optimize Process Water use V4.1
CS-v4.1 WEc3:Optimize Process Water Useposted by Michaël Briffaz on
Hi Everyone,
Air Curtains in ASHRAE/IES Standard 90.1-2019
NC-v4 EAp2:Minimum energy performanceposted by Nima Soltani on
Recent ASHRAE/IES Standard 90.1-2019 Updates include the possibility of installing an air curtain system instead of installing a Vestibule / Revolving Door Entrance.
Does LEED BD+C Core and Shell have disadvantages against ESG compliance?
posted by Leonie Wipf on
For a new built office the most suitable rating system seems to be Core and Shell. Besides LEED certification the project should demonstrate ESG compliance.
Parking Lots at undergraound at the basement
NC-v4 LTc7:Reduced parking footprintposted by Stephan Zweig on
Hello,
I have following question:
If in a project there are parking lots in the building at the basement, can this project be eligible for the credit “reduced parking”?
OPR and BOD docunets
posted by Stephan Zweig on
Hello,
at the LEED on line platform for the LEED Documentation do we need to upload the documents
Owners Project Requirements (OPR) and the Basis of design (BOD)?