Forum quick links
Minimum exhaust Rates
CS-2009 IEQp1:Minimum IAQ Performanceposted by Elodie DUMAS on
Dear all, We work on a private office building where toilet facilities are composed of several individual toilet rooms. Reading the ASHRAE 62.1, we are not sure about the occupancy category of thes
EAP2 case 1 for international projects
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Elodie DUMAS on
I have a question about the following statement from above : "We have an international project and the space type is eligible for an Energy Star rating.
Automatic sliding doors in 90.1-2007 and LEED 3.0 Projects
CS-2009 EAp2:Minimum Energy Performanceposted by Paul Deinhofer on
I am working on project whereat a big retail store wants to use automatic sliding doors for their shop entrances.
Green e energy equivalency EKOenergy
CI-v4 EAc6:Green power and carbon offsetsposted by Valentin Grimaud on
Good afternoon, I'm working for a design building company in France. We aim the LEED certification for a shop project. We try do get 2 points for the Green Power and carbon offset credit.
LEED for office with few modifications
CI-v4 MPR3:Must comply with project size requirementsposted by Devani PERERA on
A project I assess is seeking LEED v4 CI Silver.
Green roof eligibility
NC-v4 WEc1:Outdoor water use reductionposted by Davis Kantor on
Is a non-irrigated vegetated roof included in this credit calculation? It seems obvious that an accessible green roof would be. How about a non-accessible green roof?
satisfaction surveys - Ergonomics strategy
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Jean-Baptiste SARFATI on
Are there standardized satisfaction surveys for ergonomics workstations in a store ? We would like to evaluate METWAs, furnishings, and accessories to ensure they continue to meet the diversity of
Finished wood
CI-v4 EQc2:Low emitting materialsposted by Devani PERERA on
A finished wood floor has been varnished off-site previous to installation in a office project.
Warehouse
CI-2009 IEQp1:Minimum IAQ Performanceposted by Anke Koch on
Dear LEED community, we are working on a project in Berlin, Germany.
Waste Heat from Landfill Gas Plant
NC-v4 EAp2:Minimum energy performanceposted by Aaron Luthien on
Hello all, We have an office project which utilizes waste heat from the neighbor landfill gas plant. The plant and office is owned by the same company.