Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Entryway system

CS-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Elodie DUMAS  on 

Our project is an office building where groundfloor is componed by retails and services dedicated to unknown tenants. Taking into account that this is a CS certification, do we need to install ent

4
Senior Sustainability Manager
WSP
LEEDuser Expert
53 thumbs up
Tue Aug 7, 2018, 1:48 pm

WaterSense Labelling Alternatives

CI-v4 WEp1:Indoor water use reduction
posted by  Oliver Bate  on 

Hi! Toilet (Water Closet); Urinals; Private Lavatory Facuet; and Showerheads all need to be WaterSense Labelled. However- what are the equivalent labels?

5
SW Regional Design Resilience Leader
Gensler
LEEDuser Basic Member
15 thumbs up
Fri Jul 20, 2018, 2:38 am

lengths of the permanent entryway systems

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Ydo Schuuring  on 

LEED v4 describes to install a permanent entryway systems at least 10 feet (3 meters) long in the primary direction of travel, to capture dirt and particulates entering the building at regularly us

3
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Thu Jul 19, 2018, 7:30 pm

Access to the refrigerant impact calculation

NC-v4 EAc6:Enhanced refrigerant management
posted by  Mark Kumar Bose  on 

Hi,

how can I get access to the refrigerant impact calculation (on Leedonline.com) before registering in order to advice the planners if their selected refrigerant complies?

3
Dipl.-Ing., Immobilienökonom (ebs)
Masterplan Informationsmanagement GmbH
LEEDuser Basic Member
0 thumbs up
Tue Jun 19, 2018, 7:56 pm

LEEDuser’s viewpoint is little confusing

NC-v4 WEc1:Outdoor water use reduction
posted by  Mark Kumar Bose  on 

Hi,

under "LEEDuser’s viewpoint" your only refer to Option 2:

1
Fri Jun 1, 2018, 6:24 pm

Bicyle Storage in a office building

CS-v4 LTc6:Bicycle facilities
posted by  Guillaume Rose  on 

Hi,

Is the Case 1. commercial or institutional projects applicable for an office building ? 

2
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Mon May 28, 2018, 9:27 am

WaterSense labeled fixtures obligatory for Indoor water use reduction

NC-v4 WEc2:Indoor water use reduction
posted by  Mark Kumar Bose  on 

In "WEc2: Indoor water use reduction" WaterSense labeled fixtures are obligatory:

 

1
Fri Jun 1, 2018, 10:44 am

Rainwater Events Calculator v4

NC-v4 SSc4:Rainwater management
posted by  Carmen Mielecke  on 

Dear all, my 2 question refer to the rainfall events calculator. 1) the percentil is calculated on the historical data sheet. The amount is expressed in mm.

3
CEO
LCEE Life Cycle Engineering Experts
LEEDuser Basic Member
4 thumbs up
Fri May 18, 2018, 11:36 am

Using CBECS 2012 Data for Estimating Energy Consumption

CI-v4 EAp2:Minimum energy performance
posted by  Oliver Bate  on 

I have multiple office projects where there is no consumption data available as the tenants are new to the building- we are going with Option 2 Minimum Energy Performance. 

13
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed May 16, 2018, 12:18 am

advanced metering versus meters

CS-v4 EAc3:Advanced energy metering
posted by  Jens Apel  on 

I am somewhat confused comparing the requirements of C&S and New Construction.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon May 14, 2018, 6:12 am