Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Purchasing- Ongoing

EBOM-v4 MRc1:Purchasing - ongoing
posted by  VISHESH AGARWAL  on 

what percentage of documentation should be required in local food material (100 miles).

1
Wed Aug 31, 2016, 10:04 pm

Regularly Occupied Spaces

CS-2009 IEQc8.1:Daylight and views - daylight
posted by  Muzammal Abbas LEED AP (BD+C)  on 

I am working on a core and shell project and i want to clarify my below mentioned points for V3 & V4 from seniors.Thanks 1) In core and shell project for daylight do we need to add all regular

1
Fri Oct 28, 2016, 2:59 pm

Table PIf3-1 Space Usage Type - Owned vs Leased

NC-2009 PIf3:Occupant and Usage Data
posted by  Terrapin BrightGreen  on 

Hi could you confirm whether the "Owned/Leased" column is meant to reflect the project owner's usage management versus the building owner's usage?

1
Mon Jan 16, 2017, 2:11 pm

Ventilation design-worst case conditions

CI-2009 IEQp1:Minimum indoor air quality performance
posted by  S Nagarajan  on 

How to provide a narrative to explain how the worst-case condition was determined considering the total design airflow rate at the condition analyzed

1
Fri Nov 19, 2021, 6:15 pm

LEED certification fees

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Nazli Hussain  on 

Can you please tell me about all compulsory certification fees to get LEED certification? Registration fees, split / combined design review fees , appeal fees - all are compulsory . Am i right ?

1
Mon Aug 7, 2017, 4:02 pm

Reclaim land for more than 40 years

NC-v4 MPR1:Must be in a permanent location on existing land
posted by  Michael Wahjudi  on 

"All LEED projects must be constructed and operated on a permanent location on existing land" from these statement.

1
Wed Mar 16, 2016, 3:59 pm

All controls provided using customised mobile app

NC-2009 IEQc6.1:Controllability of systems - lighting
posted by  Yusuf Turab  on 

We are working on an IT office building that does not have any switches to control lighting.

1
Wed Jan 18, 2017, 1:02 am

62MZ calc for critical zones

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  Indochine Engineering VN  on 

Hi, my project has PAU to supply OA through VAVs to AHUs, which then supply air to office spaces. This PAU also supplies OA through CAVs to lift lobbies and FCUs recirculate the air there.

0

Water Fountains in an Urban Setting

NC-2009 SSc5.2:Site development - maximize open space
posted by  Doug Snyder  on 

We have a tower project in SE Asia that will have several decorative water fountains.

1
Sun Jan 8, 2017, 4:33 pm

Can a Retail CI Project achieve Water Cr if it has no Rest rooms

Retail-CI-v2009 WEc1:Water use reduction
posted by  Aswin M  on 

Can a Retail CI 2009 (restaurant) project achieve Water use reduction credit, if there is no Rest room in the (Retail CI) project scope.

1
Sat Aug 26, 2017, 11:50 pm