100% outdoor air indirect evaporative cooling system
NC-2009 EAp2:Minimum Energy Performanceposted by BEE Incorporations on
Hi everybody, The project is a garment factory. We are modeling a 100% outdoor air IEC system for the proposed case. And the system 8 (VAV with PFP Boxes) is modeled in the baseline case.
Exterior windows and doors?
NC-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Erin Holdenried on
I assume exterior window and doors are included in this credit, as they are excluded from MRc1.1?
Are changing rooms compulsory now as per revised credit form
CI-2009 SSc3.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Priyadarsi Das on
In the earlier credit form, we had to enter the total number of showers/ changing rooms in the project.
ACP for Certified Wood vs Pilot for Legal Wood
posted by Terrapin BrightGreen on
The "LEED 2009 Global Alternative Compliance Paths Credit Table" (http://bit.ly/2ovIELH) does not include an ACP for C&S MRc6 Certified Wood, but there does exist a pilot for Legal Wood (http:/
Does all of Section 1.6 results have to be filled?
NC-2009 EAp2:Minimum Energy Performanceposted by Ivan Priatman on
Dear LEED, We are trying to achieve points in EAp2 scorecard via Building Simulation Method.
Required parking lots and LEED boundary Calculations
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by kerry wang on
Hi all, We have a question about LEED boundary calculation as below: In order to save the land, our company has set up a shared parking lot in the area, so this project does not have new parking s
Project Registration
NC-v4 EAp2:Minimum energy performanceposted by Muzammal Abbas LEED AP (BD+C) on
Hi, We have project in Pakistan and we had done all measures for LEED certification, but due to some client personal reasons we were not able to register this project with USGBC and now after 1.5
Building Orientation
NC-v4 EAp2:Minimum energy performanceposted by Muzamil Rafique on
Hello Marcus, 1.My project orientation on NW,NE,SW and SE.
LEED CS 2009 - WEp1 & WEc3
CS-2009 WEp1:Water Use Reductionposted by Ruel Galve on
We are building a mixed use project, Office, Hotel and Residential to qualify for LEED CS 2009 Gold. Only the office core will have toilets that will be built during C & S construction.
Open Plan office served by 4 AHUs
CI-2009 IEQp1:Minimum IAQ Performanceposted by Michael Wahjudi on
Hi all, we received comments from reviewer that requesting the system computation should be separated for each system. Our development consists of few meeting rooms and open plan offices.