Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

100% outdoor air indirect evaporative cooling system

NC-2009 EAp2:Minimum Energy Performance
posted by  BEE Incorporations  on 

Hi everybody, The project is a garment factory. We are modeling a 100% outdoor air IEC system for the proposed case. And the system 8 (VAV with PFP Boxes) is modeled in the baseline case.

1
Mon Dec 28, 2015, 10:13 am

Exterior windows and doors?

NC-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elements
posted by  Erin Holdenried  on 

I assume exterior window and doors are included in this credit, as they are excluded from MRc1.1?

1
Thu Feb 23, 2017, 2:50 pm

Are changing rooms compulsory now as per revised credit form

CI-2009 SSc3.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Priyadarsi Das  on 

In the earlier credit form, we had to enter the total number of showers/ changing rooms in the project.

1
Wed Jan 18, 2017, 2:31 pm

ACP for Certified Wood vs Pilot for Legal Wood

General forums
posted by  Terrapin BrightGreen  on 

The "LEED 2009 Global Alternative Compliance Paths Credit Table" (http://bit.ly/2ovIELH) does not include an ACP for C&S MRc6 Certified Wood, but there does exist a pilot for Legal Wood (http:/

1
Thu May 4, 2017, 3:36 pm

Does all of Section 1.6 results have to be filled?

NC-2009 EAp2:Minimum Energy Performance
posted by  Ivan Priatman  on 

Dear LEED, We are trying to achieve points in EAp2 scorecard via Building Simulation Method.

1
Thu Nov 20, 2014, 3:05 pm

Required parking lots and LEED boundary Calculations

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  kerry wang  on 

Hi all, We have a question about LEED boundary calculation as below: In order to save the land, our company has set up a shared parking lot in the area, so this project does not have new parking s

0

Project Registration

NC-v4 EAp2:Minimum energy performance
posted by  Muzammal Abbas LEED AP (BD+C)  on 

Hi, We have project in Pakistan and we had done all measures for LEED certification, but due to some client personal reasons we were not able to register this project with USGBC and now after 1.5

1
Tue Aug 1, 2017, 2:46 pm

Building Orientation

NC-v4 EAp2:Minimum energy performance
posted by  Muzamil Rafique  on 

Hello Marcus, 1.My project orientation on NW,NE,SW and SE.

1
Thu Jun 23, 2016, 2:42 pm

LEED CS 2009 - WEp1 & WEc3

CS-2009 WEp1:Water Use Reduction
posted by  Ruel Galve  on 

We are building a mixed use project, Office, Hotel and Residential to qualify for LEED CS 2009 Gold. Only the office core will have toilets that will be built during C & S construction.

1
Tue Aug 4, 2015, 2:29 pm

Open Plan office served by 4 AHUs

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Michael Wahjudi  on 

Hi all, we received comments from reviewer that requesting the system computation should be separated for each system. Our development consists of few meeting rooms and open plan offices.

1
Mon Jan 23, 2017, 3:01 pm