Accidentally Opened Awarded Credit during Appeal Stage
posted by Bernard Sagaiyaraj on
My team member accidentally opened 2 awarded credits during the Appeal Stage for some other non-compliance credits. No changes were made to the form.
Option-3: Irrigation Meter Installed
EBOM-v4 WEc1:Outdoor water use reductionposted by VISHESH AGARWAL on
i am working on the project where project team use the STP Non potable water used for irrigation purpose. so i am reducing the 100% potable water. can i sufficient to achieve this credit.
Project located in a building with a very low fresh air rate
Retail-NC-v4 EQp1:Minimum indoor air quality performanceposted by Valentin Grimaud on
What if the project is located inside a 30-year old building with AHU supplying less than 10% fresh air rate? As we have to use the centralized ventilation system and we couldn't make any change t
WE Credit 4.2: Cooling Tower Water Management- non potable
EBOM-2009 WEc4:Cooling Tower Water Managementposted by satheesh M on
The project’s cooling requirement is being met by both chiller plant inside the project boundary as well as the chiller plant in the Building Owned DES.
Amenities Within Main Building
posted by Aswin M on
We have a Retail Commercial Interior project inside a Main building.
Painting/coating in tenant space
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Indochine Engineering VN on
Hi, My project is a mixed use building with 2 floor on the top for apartments. building developer design interior fit out in all apartment for lease.
Duct sealing methods
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by John Covello on
Hello, Can alternative methods for duct sealing be used besides plastic wrap? One of our contractors is proposing using foam to seal the end of the duct openings.
CREC purchase
CI-2009 EAc4:Green Powerposted by Harpreet Rooprai on
I am doing a CI project, in which we are attempting credit EAc4 buying doing an Indian purchase of CREC's.
Furniture heights
CI-v4 EQc8:Quality viewsposted by Subramaniam Chandrasekaran on
exactly same as the below mentioned point; for a project, the interior designer wants to know whether they have to go with 1050 mm or 1100 mm of workstation height; this clarification answers; but
LIFT Lobbies to be included in VRP Calculations
CI-2009 IEQp1:Minimum IAQ Performanceposted by Preethi Ranjith on
i want some clarity on whether it is necessary to include Lift lobbies in VRP calculation to demonstrate compliance under IEQp1 and IEQc2? These lift lobbies are not regularly occupied.