Modeling DCV Savings for Proposed Building
CS-2009 IEQp1:Minimum IAQ Performanceposted by Bernard Sagaiyaraj on
To account savings using DCV, we understand that Baseline building ventilation is to be modeled using ASHRAE 62.1 whereas Proposed building ventilation is to modeled as designed. However our Basel
Pharmaceutical Manufacturing factory project
Healthcare-v4 MPR1:Must be in a permanent location on existing landposted by Magda Aghababyan on
Hi, We are going to start a new LEED project for a pharmaceutical manufacturing facility building which will be started in a few months.
VAV boxes
CS-2009 EAp2:Minimum Energy Performanceposted by Rathnashree Bharadwaj on
We request for a clarification regarding mandating the tenant to use the VAV boxes in core and shell projects. In a core and shell project, we will not know what system the tenant will be using.
BAS
EBOM-2009 EAc3.1:Performance Measurement—Building Automation Systemposted by VISHESH AGARWAL on
Is it necessary to have exterior lighting monitor and control to achieve this credit point. if interior is on BMS, Will i able to take that credit.
V3 project Minimum Indoor Air Quality Performance Pre-requisite.
CI-2009 IEQp1:Minimum IAQ Performanceposted by sajjad Malik on
I have submitted minimum indoor air quality performance pre-requisite for final design review and reviewer ask me for a narrative but I do not find any option for upload the narrative or any option
HVAC modelling for Tenant Occupied Spaces
CS-2009 EAp2:Minimum Energy Performanceposted by Saumendra Aggrawal on
I am working on a project, which is going for LEED C&S. The project has tenant occupied space, which has designed HVAC system for it.
Open space definition
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by sompoche sirichote on
My project is in the industrial area which allows building footprint not exceeding 66% of total site area.
Can I omit the IP credit since it is stand alone?
NC-v4 IPc1:Integrative processposted by wachira sosaeng on
Generally,in other categories, we have to perform to meet all prerequisites though we don't need any credits in the categories (suppose that we have enough credits that meet our goal.
Heat Island Reduction
EBOM-v4 SSc3:Heat island reductionposted by VISHESH AGARWAL on
Dear All, Can I take option-2: Roof (1 Points) and option-4: Parking Under Cover (1 Points) Simultaneously for achieving 2 points under this category OR we need to use option-3 for targeting the 2
Purchasing- Ongoing
EBOM-v4 MRc1:Purchasing - ongoingposted by VISHESH AGARWAL on
what percentage of documentation should be required in local food material (100 miles).