Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Modeling DCV Savings for Proposed Building

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Bernard Sagaiyaraj  on 

To account savings using DCV, we understand that Baseline building ventilation is to be modeled using ASHRAE 62.1 whereas Proposed building ventilation is to modeled as designed. However our Basel

1
Fri Jan 27, 2017, 6:50 pm

Pharmaceutical Manufacturing factory project

Healthcare-v4 MPR1:Must be in a permanent location on existing land
posted by  Magda Aghababyan  on 

Hi, We are going to start a new LEED project for a pharmaceutical manufacturing facility building which will be started in a few months.

1
Sat Aug 26, 2017, 3:26 pm

VAV boxes

CS-2009 EAp2:Minimum Energy Performance
posted by  Rathnashree Bharadwaj  on 

We request for a clarification regarding mandating the tenant to use the VAV boxes in core and shell projects. In a core and shell project, we will not know what system the tenant will be using.

1
Thu Jan 8, 2015, 2:16 pm

BAS

EBOM-2009 EAc3.1:Performance Measurement—Building Automation System
posted by  VISHESH AGARWAL  on 

Is it necessary to have exterior lighting monitor and control to achieve this credit point. if interior is on BMS, Will i able to take that credit.

1
Tue May 17, 2016, 12:27 pm

V3 project Minimum Indoor Air Quality Performance Pre-requisite.

CI-2009 IEQp1:Minimum IAQ Performance
posted by  sajjad Malik  on 

I have submitted minimum indoor air quality performance pre-requisite for final design review and reviewer ask me for a narrative but I do not find any option for upload the narrative or any option

1
Thu Jul 20, 2017, 5:28 pm

HVAC modelling for Tenant Occupied Spaces

CS-2009 EAp2:Minimum Energy Performance
posted by  Saumendra Aggrawal  on 

I am working on a project, which is going for LEED C&S. The project has tenant occupied space, which has designed HVAC system for it.

1
Sun Jun 19, 2016, 8:52 pm

Open space definition

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  sompoche sirichote  on 

My project is in the industrial area which allows building footprint not exceeding 66% of total site area.

1
Wed Apr 22, 2015, 7:02 pm

Can I omit the IP credit since it is stand alone?

NC-v4 IPc1:Integrative process
posted by  wachira sosaeng  on 

Generally,in other categories, we have to perform to meet all prerequisites though we don't need any credits in the categories (suppose that we have enough credits that meet our goal.

1
Mon Aug 1, 2016, 3:21 pm

Heat Island Reduction

EBOM-v4 SSc3:Heat island reduction
posted by  VISHESH AGARWAL  on 

Dear All, Can I take option-2: Roof (1 Points) and option-4: Parking Under Cover (1 Points) Simultaneously for achieving 2 points under this category OR we need to use option-3 for targeting the 2

0

Purchasing- Ongoing

EBOM-v4 MRc1:Purchasing - ongoing
posted by  VISHESH AGARWAL  on 

what percentage of documentation should be required in local food material (100 miles).

1
Wed Aug 31, 2016, 10:04 pm