Forum quick links
RP Credit Lookup: Invalid Location in the City
Retail-CI-v4 RPc1:Regional priorityposted by Marjorie Oblinada on
Hi. My team is currently working on certifying a LEED v4 ID+C:Retail project and wishes to pursue the regional priority credits to gain additional points.
Compliance in early construction
NC-v4 SSp1:Construction activity pollution preventionposted by ARDOR GREEN on
Dear all,
Examples of Completed (filled up) Templates
posted by Muhammad Riazul Hamid on
This is my first LEED NC project as a LEED Consultant. Could anyone please give the links where I can download examples of previously filled up templates?
Baseline Ventilation Rate for Proposed design with DCV (not required under 6.4.3.9)
CS-2009 EAp2:Minimum energy performanceposted by Iqbal Khalilullah on
Dear Marcus,
I wish to ask you regarding the Baseline Ventilation rate.
Plan Views
NC-2009 IEQc8.2:Daylight and views - viewsposted by Dinesh V on
Is there a minimum horizontal distance from the glazing/window to meet the requirements of this credit?
Fan - interior ventilation EFLH
NC-v4 EAp2:Minimum energy performanceposted by Michael on
Hi,
i'm dealing with EFLH for interior ventilation in baseline and propose, over 8000h/year, double than another ones such us space cooling and receptacle EFLH, <4000h/year?
Retrofit of a existing building into green building
EBOM-2009 WEc1:Water performance measurementposted by Mohammed Ibrahim on
Guide Language
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by PAWAN DAHIWAL on
Under several material credits its mentioned that "Procure 20 different permanently installed item from 5 different manufacturer"...for EPD/CSR My question is, 1) To meet the requirement under th
Excuse me, how to set the LEED online for refrigerant R-32?
NC-v4 EAp4:Fundamental refrigerant managementposted by JASON NIEN on
Excuse me, how to set the LEED online for refrigerant R-32?
Energy Simulation Baseline
CS-2009 EAc1:Optimize energy performanceposted by Yong Lee Low on
Hi, i'm working on an office building of 95,000sqm using a District Cooling System (DCS). I am using the HAP E20 software for simulation.