Rainwater management

NC-v4 SSc4:Rainwater management
posted by  Ahmed Hamed  on 

how to Calculate runoff volume to be managed on site giving rainfall data?

0

Clarification on Previously Developed Land for LEED Certification

NC-v4.1 LTc2:Sensitive Land Protection
posted by  Alefiya Bhiwandiwala  on 

I would like to clarify the eligibility of a site for the "Previously Developed Land" option in LEED certification.

1
Fri Sep 6, 2024, 3:11 pm
4
Default Avatar
LEEDuser Basic Member
0 thumbs up
Thu Sep 5, 2024, 12:19 pm

High priority site

NC-v4 LTc3:High priority site
posted by  Ahmed Hamed  on 
  • How to apply Priority Designation option outside the U.S
1
Thu Sep 5, 2024, 2:27 am

Heat Island Mitigation with Cool Walls

CS-v4.1 INc1:Innovation
posted by  Hoda Ibrahim  on 

I have worked in a project that used wall materials selected based on their high Solar Reflectance Index (SRI) and Thermal Emittance values.

0

Occupancy Discrepancy Between Thermal Heat Load Summary and LEED Calculation

CS-v4 EQp1:Minimum indoor air quality performance
posted by  Alefiya Bhiwandiwala  on 

I'm working on a project in UAE, where the thermal heat load summary considers an occupancy of around 1,500 people.

1
Mon Sep 2, 2024, 10:03 am

Baseline for unconditioned building

NC-v4 EAp2:Minimum energy performance
posted by  Amgad Khattab  on 

we have a dormitory building with mechanical ventilation (treated with cooling to reach 20 C and a CAV reheat terminal ) only associated with ceiling fans, shall we model the baseline with no

1
Wed Aug 21, 2024, 2:49 pm

Modeling of Steam Humidifiers in the Baseline

NC-v4 EAc2:Optimize energy performance
posted by  Hanin Hamdan  on 

Hi,

I am working on a Mixed Hotel Project with Amenities and Residences in a Hot and Dry Climate, Zone 1B.

1
Fri Aug 2, 2024, 10:01 pm

Office kitchen to be considered as regularly occupied space for Daylight Analysis

NC-v4 EQc7:Daylight
posted by  Rajat Kumar  on 

We are working on a project involving an office building with a kitchen with a total area of 50 square meters. We don

0

BUS SERVICES PROVIDED BY SCHOOL TO MEET QUALITY TRANSIT REQUIREMENT

Schools-NC-v4.1 LTc5:Access to Quality Transit
posted by  Amal Venugopal  on 

The query is for a school project which is in a location with no bus or any other mode of transporation within LEED proximity range , to meet the Quality transit credit, Opt1.

2
Default Avatar
Owner | Founder
EcoAmmo Sustainable Consulting Inc.
LEEDuser Basic Member
0 thumbs up
Thu Jul 18, 2024, 3:08 pm