Forum quick links
Water Budget Calculation
Pilot-Credits WEpc110:Water Restoration Certificates®posted by Jason Biondi on
What if there is no premanant irrigation as well as no stipulated process water (chiller, cooling towers, commercial kitchens, healthcare water systems) usage ?
Option 1. Path 1 - poverty rate
NC-v4.1 LTc3:High Priority Site and Equitable Developmentposted by Jennifer Atherton on
To determine the census tract poverty rate based on Statistics Canada 2016 Census of Population data, which metric do I reference?
Pilot Credit - LTpc134 Advanced Transportation Monitoring - how do you share the data?
CS-v4.1 INc1:Innovationposted by Lauren Leatherbarrow on
For LEED v4 Core & Shell 14 story office building in USA with underground garage we are attempting this credit - monitoring the garage traffic and at the elevator turnstiles. The requirem
Perimeter area calculation
Healthcare-v4 EQc7:Daylightposted by Priscillia Champagne on
Does anyone know if the perimeter area to be used for Healthcare projects excludes from the calculations the non-regularly occupied space within that perimeter, or do we need to include the whole a
Exempt from Indoor Water Efficiency pre-requisite?
NC-v4 WEp2:Indoor water use reductionposted by Lawrence Lile on
We have a project that includes no bathrooms, kitchens, or other indoor water use. There is an industrial process that uses water, which we will address separately. Can we claim exempti
ECOREGION LEVEL III PLANT LISTS??
NC-v4.1 SSc2:Protect or Restore Habitatposted by Sara Hicks on
Anyone have a suggestions on how to find native plants as specific as the ecoregion required? I can't find any resources that provide this information.
CLT Buildings
CS-v4.1 MRc3:Sourcing of Raw Materialsposted by Marelle Davey on
Hi - has anyone targeted this credit for a CLT building?
Emergency Exit lights report on Purchasing calculator?
EBOM-v4 MRc2:Purchasing - lampsposted by John Covello on
Hello,
Is it necessary to report LED Emegrency Exit lights on the purchasing calculator? Do emergency exit lights fall under this credit? Best regards, John
Credit requirement wording : with the intention of multiyear renewal
NC-v4 EAc4:Demand responseposted by John Covello on
Hello,
Building Area Method and Space-by-Space Method for lighting power density
NC-v4.1 EAp2:Minimum Energy Performanceposted by Ying Lindsey on
Dear All,
I have a question regarding lighting power density with the building area method and with the space-by-space method.