Forum quick links
Systems requiring metering
CS-v4 EAc3:Advanced energy meteringposted by Tim Nabholz on
Hi All, I am pursuing this credit for a LEED v4 Core and Shell project and am having trouble determining which systems require meters.
Reviewer requires cutsheets
NC-v4 EQc6:Interior lightingposted by Edgar Arevalo on
Ok so I get a comment from the LEED reviewer asking for cutsheets of the lighting fixtures to back up the strategies I'm pursuing for the Lighting Quality section of this credit. I need to as
Reviewer requires cutsheets
CI-v4 EQc6:Interior lightingposted by Edgar Arevalo on
Ok so I get a comment from the LEED reviewer asking for cutsheets of the lighting fixtures to back up the strategies I'm pursuing for the Lighting Quality section of this credit. I need to as
Glare Control for Regularly Occupied Spaces
NC-v4.1 EQc6:Interior Lightingposted by Lauren Kottis on
"For all regularly occupied spaces, meet one of the following requirements:
PV and Battery
NC-v4.1 EAp2:Minimum Energy Performanceposted by Kristin Hernandez on
I am working on a new construction project in California that required PV and battery per Title 24. Does this need to be accounted for in the energy model?
LPD for IT Rooms and IT Closet
CI-v4 EAp2:Minimum energy performanceposted by Edgar Arevalo on
So according to 2010 ASHRAE 90.1, there is no LPD requirements for IT closets. Yet the lighting for the project in question was adhereing to the ASHRAE 2016 90.1 standard, which has a space t
Anti-Ligature fixtures
NC-v4 WEp2:Indoor water use reductionposted by Leanne Conrad on
The reference guide is clear that special or unique water closets can be excluded from the credit calculations, my query is does this expand to special or unique fixtures?
Pursuing Whole Project Pilot in residential buildings
Pilot-Credits WEpc115:Whole Project Water Use Reductionposted by Paul Erlichman on
Hello,
I posed a similar question in the forum for the Optimize Proces Water Use credit, but I figured I would post an addendum of sorts in the pilot credit forum.
Water source heat pump with cooling tower and boiler
CI-v4 EAc3:Advanced energy meteringposted by Gaston Michaud on
Hi all!
Can someone with old LEED AP credentials
CI-v4 INc2:LEED Accredited Professionalposted by Edgar Arevalo on
For the LEED CI project that I'm currently working on. We are looking to pursue the LEED Accredited Professional credit, the thing is I would use my credentials but it's only for LEED AP BD+C