Schools-2009 IEQc7.2:Thermal Comfort—Verificationposted by Matthew Heaton on
A comment that came back on our IEQc7.2 design review asked us to "Please provide confirmation that the survey will be administered to include all building occupants, including students of grades s
Lose Leed Certification?
posted by Tim Meadows on
We have a parking deck that is LEED certified. We have several EV charging stations in employee and visitor areas.
Office Transient
NC-2009 PIf1:Minimum Program Requirementsposted by Nate Steeber on
I received some technical advice on my project regarding the occupancy. I have a mixed-use building. Primarily office spaces with a tenant fit out cafe and restaurant.
VOC Compliant Chemicals - IEQ3.3
EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materialsposted by Jessica Wasmuth on
I am working on compiling a list of our Green Chemicals used onsite for a LEED certification.
Addition added after documentation has been submitted
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Angela Bickford on
I think I know this answer to this, but I can't find an answer anywhere so I would like someone else's opinion. I'm working on a LEED for schools project. About 3/4 of the building was renovated.
LEED final review...past due?
posted by John Stouffer on
Is LEED final review typically late? The anticipated date of return was 10 days ago. We're getting a little nervous. We did have a clarification, but that was returned in a timely manner.
SSc4.3 Option 2: How long must charge stations be installed ?
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Kimberlyn Caoagas on
How long must charge stations be installed in order to be credit compliant? How is the project affected if clients remove charge stations if they are not being used?
Pre-existing Campus PV Array - Does commissioning apply?
NC-2009 EAc2:On-Site Renewable Energyposted by Heather DeGrella on
If we are allocating production from a campus PV array, in which the array is already built and outside of our LEED boundary, how do commissioning requirements apply?