Chilled water pumping head > baseline design

NC-2009 EAp2:Minimum Energy Performance
posted by  Victoria Watson  on 

Hi, h Has anyone come across issues with the chilled water pumps in the proposed and baseline building W/gpm being very different.

2
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Thu Oct 23, 2014, 3:08 pm

New Product

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Stefanie Smith  on 

Hello, Has anyone encountered a product that is new on the market and therefore is still in the process of becoming FloorScore Certified?

3
Default Avatar
AIA
Stark State College
LEEDuser Basic Member
4 thumbs up
Thu Oct 23, 2014, 2:57 pm

EBOM & the future

General forums
posted by  Shevaun Barrie  on 

On the acceptance of EBOM: Having just returned from the National Conference on Building & Facility Operations in Vancouver BC, it was identified that building owners feel that existing buildin

3
President, LEED AP, WELL AP
Entegra Development & Investment, LLC
LEEDuser Premium Member
43 thumbs up
Mon Oct 20, 2014, 10:48 pm

Simultaneously encouraging and frustrating...

General forums
posted by  Brian Salazar  on 

Tristan - Nice article and review of the LEED "Feedback Plaque" as some folks are calling it. You asked for our feedback on the plaque itself as well and I have to admit that I'm conflicted.

6
President, LEED AP, WELL AP
Entegra Development & Investment, LLC
LEEDuser Premium Member
43 thumbs up
Mon Oct 20, 2014, 9:03 pm

Ventilation Effectiveness

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Dustin Balton  on 

I am working for a client who has a variable refrigerant HVAC system with a separate fully condition ventilator supplying fresh air.

4
Mon Oct 20, 2014, 5:21 pm

An unusual situation with Recycling Tickets

NC-2009 MRc2:Construction Waste Management
posted by  Christine Castellano  on 

As the general contractor on a recently completed LEED project, all of the tickets I've received from the off-site waste separation facility listed the tonnage diverted by item, i.e., concrete, met

3
Mon Oct 20, 2014, 4:09 pm

Fire Department Practice Burn

NC-2009 MRc2:Construction Waste Management
posted by  Brian Leet  on 

We have a project on a large campus which has involved demolition of over a dozen buildings.

2
Default Avatar
LEEDuser Expert
472 thumbs up
Mon Oct 20, 2014, 4:02 pm

No autosizing of equipment on proposed?

NC-2009 EAp2:Minimum Energy Performance
posted by  Saju Varghese  on 

Is there a reason why the equipment on the proposed can not be autosized?

2
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Mon Oct 20, 2014, 11:13 am

Cost!

General forums
posted by  Nelina Loiselle  on 

The cost is $6,000 a year! For a plaque!

9
Founder & CEO, LEED Fellow, BREEAM Fellow
BuildingWise LLC
LEEDuser Expert
224 thumbs up
Thu Oct 16, 2014, 8:20 pm

Re-applying for a credit approved in Design submittal

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Shivani Langer  on 

At the time when we were submitting our design submittal, the elementary school project was only going to be able to get 7% of its energy offseted with renewables.

7
Director of Sustainability
HMC Architects
LEEDuser Premium Member
20 thumbs up
Tue Oct 14, 2014, 12:20 am