NC-2009 EAc1:Optimize energy performanceposted by Victoria Watson on
Hi all, I am working on a project where the CRAC unit manufacturers have said they don't need to comply with the efficiency requirements of ASHRAE 90.1 for a data room and comms rooms air conditio
LEED v4 delay with ACC implications..??
posted by Mark Perepelitza on
One thought that keeps coming into my mind is how this comes on the heals of the recently announced 'partnership' with ACC. My guess is that this has something to do with the delay.
All purpose putty
CS-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by James Emery on
I don't believe putty can be categorized as an adhesive or a sealant, but the proposed putty in our project has a VOC of 161 g/l and is being used for filling nail holes and other defects in refurb
How to model Unit Heaters in Baseline model
NC-2009 EAc1:Optimize energy performanceposted by Dónal O'Connor on
To Whom It May Concern: I'm looking for guidance on how unit heaters, radiant panels and electric heaters that are in the proposed design are modeled in the baseline building.
Changing from LEEDv4 to LEED 2009
posted by P Fanfulik on
I registered a project under LEEDv4 (#100038645) because my anticipated completion was past the LEEDv4 sunset date.
IEQ4 credit uploads
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Shivani Langer on
We are trying to submit credits IEQ4.1, 4.2, 4.4 and 4.5 under LEED for schools version 2009.
Microturbines and gas rates for energy modeling
NC-2009 EAc1:Optimize energy performanceposted by Sherman Aronson on
For a high rise project the client is considering investing in micro-turbines to generate electrical power on site from natural gas.
More Info on Program is Needed
posted by Melissa Wrolstad on
There is not very much information released on the program yet, even if you speak directly with representatives of the program and drill them with pointed questions.
Press Release Location
posted by Suzanne Johnson on
I have not been able to find the referenced press release to share with clients. Please let us know where to find it. Thank you.
Should LPD Area match with Gross Project Square Footage?
CI-2009 EAc1.1:Optimize energy performance - lighting powerposted by Sunayana Jain on
I have a project in which my calculated area by space by space method is slightly more than the area inserted by LEED Admin in "Gross Project Square Footage". Should these numbers match?