Uploads and deleting uploads - is the webinar posted somewhere?
posted by Susan Di Giulio on
I watched the webinar on how to use the new site on January 5, and I have been to the uploads page for the project in question but I can't remember how to upload docs and how to delete previously u
VOC Budget shortcut?
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Rick Farrell on
We are a wood floor contractor who often does site finished wood floors on commercial LEED projects, mostly in Texas. The water based urethane we use states the following on the MSDS VOLATILE ORGAN
LEED/ASHRAE definition of a preheat coil?
NC-2009 EAp2:Minimum Energy Performanceposted by Rock Ridolfi on
The proposed system includes an ERV serving two packaged rooftop units.
recovered wood fiber
NC-2009 MRc4:Recycled Contentposted by Michele Helou on
I have two products - Uniboard Nugreen Particleboard and Temple Inland Ultrastock free MDF which both claim to contain 100% recycled/recovered fiber on a dry weight basis.
What is the Air Vapor Barrier?? Roofing Membrane still exempt?
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Michele Helou on
Many wall/roof systems have more than one air barrier - what exactly defines what is inside the weather/air barrier - the most interior air barrier? a minimum perm rating?
Furniture - Piano and Ping Pong Table?
Pilot-Credits MRpc80:Environmentally preferable interior finishes and furnishingsposted by Lea McRoberts on
Where does LEED draw the line on furniture? I have a project w/ a spendy piano and ping pong table, do these count? Thank you, Lea
Open Floor Plan with different Tvis Values
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Marisa Britton on
Can I do prescriptive method of calculation for an open floor plan if the N+W glazing walls of the building have a Tvis of 38% and the South + East glazing walls have a Tvis of 56%?
Future Expansion
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Karl Heitman on
Our project, an industrial manufacturing facility, is expecting future expansion, and it has been noted on our permit/construction drawings.
Does CI fit into BD+C?
posted by Sara Greenwood on
Hello, I am developing TI Guidelines for unfinished retail space in a building pursuing BD+Cv2009. Can the future tenant pursue CI?
Transitional Entry Atrium Lobby belong in Energy Model?
NC-2009 EAp2:Minimum Energy Performanceposted by Joyce Kelly on
A five story Atrium is being constructed in a science building. It is also the main entry into the building and furnished with benches for transient use.