Help w/ wrangling RECs.
CS-2009 EAc2:On-site Renewable Energyposted by Brian Salazar on
Preface: LEED CS v3.0 Project in Massachusetts. Our project is designed to produce 16% on-site renewable energy. The energy is fed directly into the building and used by the building.
Questions about High-rise residential LEED Energy Modeling
NC-2009 EAc1:Optimize Energy Performanceposted by Tommy Xing on
Hi, I’m working on a High-rise residential LEED energy modeling project now. I have a question regarding the lighting.
Compliant area
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by David Browne on
Perhaps this a dumb question, but would someone please clarify this for me? I am currently attempting this credit on two projects.
HVAC system wasn't running during construction
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Juanita Garcia on
If the HVAC system wasn't running during construction of a new building, what is the requirement for documentation? We have dated checklists documenting that the HVAC system wasn't running and that
Exterior Shading Devices
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Sara Zoumbaris on
Hello LEED Users, I am working on a project with a majority of the exterior being composed of aluminum curtain wall.
Is the credit for during construction, or after envelope is up?
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Nelina Loiselle on
We have an issue with a General Contractor on a project.
Fuel Stations for Shared Parking Lot Outside of LEED Boundary
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Mary Kay on
Our project has no new parking. We are on a campus where there is an existing parking lot adjacent to our building, but not within our LEED project boundary.
Submitting this point in v2009
EBOM-v4 EQc9:Integrated pest managementposted by Tracy Smith on
I am submitting a project under v2009, but my pest control contractor has been encouraging us to switch to the v4 pest control guidelines instead of the v2009.
Upload requirements for EA Cr 4: Enhanced Refrigerant Management
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Kathy Wislocky on
Hi, I'm hoping to get some feedback on what is actually required to be uploaded in support of table 4-1.
On-going Commissioning
EBOM-2009 EAc2.3:Existing Building Commissioning—Ongoing Commissioningposted by Tracy Smith on
We have already been awarded EAc2.1 and EAc2.2. To get these points we did a retro commissioning report. When we resubmit, we are considering going for EAc2.3.