Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Assesment rooms at rehabilitation Center

NC-2009 IEQc6.1:Controllability of systems - lighting
posted by  Saju Varghese  on 

Hello everyone. I was wondering if triage assessment rooms need to be considered workstations since this is where patients are going to be evaluated before admission.

1
Fri Nov 27, 2015, 9:29 pm

SSc2 - Can on-campus uses apply towards "basic services"?

NC-2009 SSc2:Development density and community connectivity
posted by  Jordan Petersen  on 

We are currently attempting to achieve SSc2 Development Density + Connectivity on a University Campus for the construction of a number of student housing units.

1
Wed Oct 26, 2016, 2:19 pm

New to LEED Submitals

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Joel Clonch  on 

I have a mill-work submittal that requests : LEED Submittals: 1. Product Data showing VOC content does not exceed 30 g/L for wood adhesives and 80 g/L for contact adhesives. 2.

1
Tue Jan 17, 2017, 2:31 pm

Historic Bldg Renovation being done in phases, Bldg reuse calcs

NC-2009 MRc1.1:Building reuse - maintain existing walls, floors and roof
posted by  Debra a. Lombard  on 

I'm working on behalf of a GC on a complicated historic renovation and new construction project that's being done in several phases with separate contracts between Owner and GC.

1
Mon Mar 28, 2016, 6:39 pm

WEc2: Time frame for functional reclaimed water systems

NC-2009 WEc2:Innovative wastewater technologies
posted by  Brian Bartholomew  on 

Under the Bird's Eye View here for WEc2, there is a citation of LEED Interpretation #10012 made on 05/09/2011 which states "projects may only count future infrastructure such as reclaimed water sys

1
Sat Aug 26, 2017, 9:52 pm

MRc5 Material Tracking/Documentation

CS-2009 MRc5:Regional materials
posted by  Maggie Hogan Skaug  on 

RE: usgbc.org/leedonline, CS2009 MRc5 I do not see a form or calculator for material tracking or other forms/upload requirements for this credit documentation.

0

searching out no voc floor sheathing and mdf

NC-2009 IEQc4.4:Low-emitting materials - composite wood and agrifiber products
posted by  Phil Vanderloo  on 

I was hoping someone can direct me to a resource, available to Sacramento Ca., for compliant, (no voc or urea formaldehyde), 1 1/8" T&G plywood floor sheathing. Thank You

1
Mon Jun 13, 2016, 12:15 am

Phased Flush Out

Schools-NC-v4 EQc4:Indoor air quality assessment
posted by  Cynthia Kaplan  on 

We have a phased reno/add school project that would prefer to earn IEQ 4 by way of post occupancy flush out.

1
Mon Aug 28, 2017, 2:09 pm

FSC Wood COC

NC-2009 MRc7:Certified wood
posted by  Andy Prestridge  on 

We have received the FSC invoice for some of our FSC plywood and our subcontractor had it delivered to his shop a few miles away and then brought it to the site.

1
Wed Dec 30, 2015, 7:46 pm

MRpc69 Attainable in the New Construction Project

Pilot-Credits MRpc69:Construction and demolition waste management
posted by  Vanessa Cardona  on 

This credit was readily attainable for a new residential building located in Manhattan. Six streams were recycled by tracking waste throughout the construction phase of the project.

0