Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

v2009 Project to comply using Building Automation System?

NC-2009 IEQc6.1:Controllability of systems - lighting
posted by  Sara Greenwood  on 

Hello, I do not see any feedback on the use of incorporating a building automation system where building users can inform the building engineer to change light levels or temperature by calling or m

1
Wed Jan 18, 2017, 1:14 am

Master's Research Survey

Pilot-Credits MRpc76:Material ingredient reporting
posted by  Vibha Pai  on 

I am conducting this survey in affiliation with University of Cincinnati in support of my hypothesis for my Master's thesis. It would just take 10-15 minutes of your time.

0

Exemplary Performance - Unobstructed View

NC-2009 IEQc8.2:Daylight and views - views
posted by  Erin Holdenried  on 

I am having a hard time understanding the criteria for "unobstructed view". Does it have to do with interior space layout and the depth of the space in relation to the exterior window? Thanks

0

Additions While Project is in Certification Review Process

Schools-2009 PIf2:Project Summary Details
posted by  Robert Fiala  on 

We have a large school project (340,000 sf) that has been submitted for the design phase review and all design phase points are reviewed and marked as anticipated.

1
Tue Nov 24, 2015, 8:03 pm

simple box model

NC-v4 IPc1:Integrative process
posted by  Courtney Royal  on 

how do you define a simple box model? for example, do you need to model thermal zones, etc.

1
Wed Apr 26, 2017, 2:01 pm

ETS During Construction

NC-v4 EQp2:Environmental tobacco smoke control
posted by  L W  on 

Does the ETSC prerequisite apply during construction as well?

1
Thu May 7, 2015, 10:09 pm

Fraction use of FSC materials

NC-2009 MRc7:Certified wood
posted by  Lilian Seow  on 

This question and answer come from above and Missing Manual: A product has FSC-certified veneer, but a non-certified core. Can we prorate the MRc7 contribution of this product based on the cost of

0

Dormitory Views

NC-v4 EQc8:Quality views
posted by  Ryan White  on 

Hello, We are working on a dormitory and our window sills in the units are at 44" or 46". The view range is obviously 30"-90" aff but it also states specifically the 42" eye height.

0

Dormitory Washing Machines

CI-2009 WEp1:Water use reduction
posted by  Vicki Rybl  on 

I am working on a dormitory project that includes washing machines. The v2009 water use reduction calculator (process tab) has an option for commercial clothes washers, but not residential.

1
Thu Sep 1, 2016, 1:59 pm

Other universal design strategies

Pilot-Credits PC34:Design for Adaptability
posted by  Christine Robbins-Elrod  on 

It would be great to see future iterations of this credit also address reinforcing for the future install of grab bars at unit bathrooms and perhaps the inclusion of a 5' turning radius at unit bat

0