following v4 requirements?
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Erica Downs on
Any idea if the v4 version of this credit (MRc1 Building Life-cycle Impact Reduction) could be substituted here? Or maybe pursued for an innovation point?
Views for Ballroom (Conference Center)
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Qiongwen Kong on
We have a project that consists of a 17-story and a large conference center on lower levers.
ASHRAE version for taller buildings
Mid-Rise-v4 EQp1:Ventilationposted by S. Sachs on
We are working on a multi-family residential building, which is 7 stories tall.
Classroom Building on a Commuter College Campus
Pilot-Credits PC14:Walkable Streetsposted by Allen Schaffer on
Our 90,000 SF Humanities Building on a commuter college campus was just about the most perfect project for this pilot credit.
(HERS) index score of at least 75
ND-v2009 GIBc2:Building energy efficiencyposted by mugahid khatib on
for a residential LEED ND project seeking LEED ND Plan certification only, the Homes that are required to achieve at least 75 HERS index. is providing a RESNET HERS model enough , or should the h
Injected foam insulation with 0 g/L VOCs
Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systemsposted by Erin Holdenried on
I have a project using Injected foam insulation with 0 g/L VOCs. Does this product meet the credit intent? Or must it meet the specific CDHS testing requirements?
Baseline ratios
CI-v4 LTc5:Reduced parking footprintposted by Susan Di Giulio on
Is there guidance anywhere as to how to interpret the Institute of Parking Engineers tables? There are many columns, but none say exactly "baseline ratio". Or what it is a ratio of.
Manufacturing Location to Distance Jobsite
CI-2009 MRc5:Regional Materialsposted by Hope Peg on
Hi Everyone!! I need help- please.. National Gypsum Sheathing is manufactured in Mount Holly North Carolina and my Project is located In Silver Spring , Maryland .
Living Wall
Retail-NC-v4 WEc4:Water meteringposted by Joanne Sawatzky on
We have a CI project and are targeting this as an innovation credit. There is not outside space, but there is a living wall inside.
Minimum Energy Performance Calculator - Receptacle Equipment
NC-v4 EAp2:Minimum energy performanceposted by Mark Zoeteman on
Minimum Energy Performance Calculator on process loads tab under receptacle equipment modeling methods paragraph indicates there are three options to model receptacle equipment: average equipment p