Demolished Building - Material Reuse
NC-2009 MRc3:Materials Reuseposted by Lauren Bellamy on
Our client has demolished the existing structures on our site and salvaged all the cladding and flooring materials (i.e.
about flooring grout category in low-emitting materials
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Leslie Synnestvedt on
I am working on the low-emitting materials calculator and looking at the flooring system right now. I am a bit confused about the category that flooring grout falls into. For Option 1.
Number of signs required to be considered "comprehensive"
NC-2009 IDc1:Innovation in Designposted by Kristin Walsh on
I have an ID credit for Green Education pending because the number of signs in the Signage Program is not enough to be considered comprehensive.
Can the credit be use within the Campus Approach
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Luis Huertas on
Can this credit be used at a campus, if all the buildings are being built at the same time within the same Master Site?
Can we use the IEQc4.5 Furniture and Furnishings as an ID credit
NC-2009 IDc1:Innovation in Designposted by Carmen Vidal-Hallett on
Hello: Our team is completing the maximum amount of credits under the IEQc4 and we were wondering if the IEQc4.5 Furniture and Furnishings can be counted as an Innovation and Design credit.
CxA for Enhanced
CI-v4 EAc1:Enhanced commissioningposted by Tony Haschke on
The project is under 20,000 sq. ft and only a tenant finish in an existing building. Can the CxA be an employee of the design firm for the enhanced Cx?
CFD Model
Healthcare-v2009 IEQc5:Indoor chemical and pollutant source controlposted by ESD Engineer on
I'm currently working with a CFD modeler for the contaminants portion of this credit. We're having trouble finding the generation rates per square foot of active contaminant.
Task Lights in Scope
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Jonathan Weiss on
Our owner is trying to save money, and we're trying to reduce plug loads by discouraging task lighting except where needed.
Sculpture Lighting
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Kristopher Croghan on
Our client is looking at a sculpture for an LEED CI space. The sculpture is made from wire and LED lighting.
Phasing Multiple LEED Projects
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Sara Zoumbaris on
We are working on a development where the project site is composed of two adjacent parcels of land.