Forum quick links
Can the credit be use within the Campus Approach
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Luis Huertas on
Can this credit be used at a campus, if all the buildings are being built at the same time within the same Master Site?
MRpc112 - Certified Multi-attribute Products and Materials
CI-2009 IDc1:Innovation in Designposted by Maki San Miguel Paulson on
We have registered for this Pilot credit, but I don't understand the credit language. We have Level 3 BIFMA certified product (Knoll furniture) which is worth about 12% of the total product cost.
Mechanical Boundary Differs from Overall Project Boundary
NC-2009 PIf2:Project Summary Detailsposted by John Havenstrite on
I am working on a project where the architectural work includes "facelift" work with no HVAC upgrades in roughly half of the scope.
Enhanced Cx -CxA in an Integrated Project Delivery IFOA format?
CI-2009 EAc2:Enhanced Commissioningposted by Margaret Montgomery on
In a contractual situation where the contractor, owner and architect are bound in a single contract, who is able to hire the CxA for enhanced commissioning?
CxA for Enhanced
CI-v4 EAc1:Enhanced commissioningposted by Tony Haschke on
The project is under 20,000 sq. ft and only a tenant finish in an existing building. Can the CxA be an employee of the design firm for the enhanced Cx?
CFD Model
Healthcare-v2009 IEQc5:Indoor chemical and pollutant source controlposted by ESD Engineer on
I'm currently working with a CFD modeler for the contaminants portion of this credit. We're having trouble finding the generation rates per square foot of active contaminant.
Task Lights in Scope
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Jonathan Weiss on
Our owner is trying to save money, and we're trying to reduce plug loads by discouraging task lighting except where needed.
Sculpture Lighting
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Kristopher Croghan on
Our client is looking at a sculpture for an LEED CI space. The sculpture is made from wire and LED lighting.
Phasing Multiple LEED Projects
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Sara Zoumbaris on
We are working on a development where the project site is composed of two adjacent parcels of land.
Hardscape covered by building.
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Robert Webber on
I'm working with a team on a hotel project, which is a highrise in a dense urban environment (100% of the site is covered by the building).