LEED V4 DATA CENTER
NC-2009 PIf1:Minimum Program Requirementsposted by Caroline Vallieres on
There is a new data center extension to an existing building of a different use (office). The extension is accessible via a corridor. The buildings do share an electrical box.
Recycling Areas for Multifamily/commercial project
NC-2009 MRp1:Storage and collection of recyclablesposted by Rob Hink on
I am working on a multifamily housing project with commercial spaces. The commercial spaces are on the first 2 floors. There will be individualized retail space and office space.
Baseline HVAC schedules
NC-2009 EAp2:Minimum energy performanceposted by Vernon Smith on
The project will apply for certification under LEED v2009 NC. The Proposed design is a 50,000 sf three story building (two above ground plus a full basement) with a central atrium.
SSc5.2 Project Boundary
NC-2009 SSc5.2:Site development - maximize open spaceposted by Christopher Widdowson on
If we are using a portion of adjacent Conservation Area to maximize the Open Space via a permanent easement, do we include the easement area within the Project Boundary on all documentation?
VVT System
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Brian Kenney on
Hello, We have a design completed in California with constant volume packaged rooftops controlled as a VVT system. The owner is contemplating getting LEED certification.
Irrigation Submetering
EBOM-v4 SSp1:Site management policyposted by Ileana Delgado on
Under the Site Management Policy template there is an area on irrigation management which explains the procedure for a proper preventive maintenance, and it mentions: Check for leaks using irrigati
Does an indoor sewage pit need exahust for EQc5?
CS-2009 IEQc5:Indoor chemical and pollutant source controlposted by Kristopher Lashley on
We have a project where there is a sewage pit located on floor P2 of the parking garage.
Minimum Weekday/Weekend Trips
NC-v4 LTc5:Access to quality transitposted by Kevin Dunphy on
I am looking for clarification on the terminology and corresponding input fields of the credit form.
building-height-to-street-width ratio
Pilot-Credits PC14:Walkable Streetsposted by Eric Carbonnier on
How does the building-height-to-street-width ratio promote walkable environments?
LEED Online Form Help for Process Water
Retail-CI-v2009 WEp1:Water use reductionposted by Sara Zoumbaris on
Hello, I have a project with three pieces of process water equipment and I have a few questions about the form. 1.