Using interpretation 10203 for a hotel site
NC-2009 PIf1:Minimum Program Requirementsposted by Susan Di Giulio on
We have a LEED-NC 2009 hotel project and are trying to determine if we conform to interpretation ID#10203 of 07/01/2012 allowing certain hotel, school and other multiple-building projects to regist
Residential on a university campus.
NC-v4 LTc4:Surrounding density and diverse usesposted by Peter Doo on
How are student residence halls classified on a college campus?
Lighting Controls in Jewelry Store
Retail-CI-v2009 EAc1.2:Optimize energy performance - lighting controlsposted by Luke Wild on
We are working on a LEED project for a jewelry store which has millwork with lighting in it all around the store.
Bike stor. and shower facility sharing between NON LEED and LEED
Schools-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Amoy McGhee on
The school project we are working on has bicycle storage but no shower facility provided. This school is also connected to a NON-LEED building that has gymnasium.
preventive maintenance program
EBOM-2009 WEc2:Additional Indoor Plumbing Fixture and Fitting Efficiencyposted by Kimberly Hosken on
I am certifying a project following the "streamlined path" as the building was certified LEED Gold NC 2.2.
Duct Testing and Cleaning
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Ramon Ramos on
What is the criteria for triggering duct testing and cleaning reports for both plans?
Crawl Space Inquiry
NC-2009 PIf2:Project Summary Detailsposted by Sara Zoumbaris on
Should a crawl space be included in the GSF of a project if it's completely empty (not hosting any mechanical equipment?) If the crawl space DOES have mechanical equipment within it, should it be i
Commissioning Starting After 50% CDs
NC-2009 EAc3:Enhanced Commissioningposted by Sara Zoumbaris on
I could have sworn there was an LI (LEED Interpretation) discussing / approving a certain scenario where Enhanced Commissioning had been started after 50% CDs and was still acceptable under this cr
phases of project & VOCs
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Debra a. Lombard on
we are a GC working on a project that is the renovation of a historic bldg and that renovation started a very long time ago '(about 3 yrs ago) and about a year before the project was registered for
No Tenant Fit Out
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Kimberlyn Caoagas on
I'm working on a 12-story office building. To my knowledge, there are no concrete tenant fit outs yet (since the tenants have yet to be known). Would the project be able to pursue IEQc8.1/8.2?