Functional entryway of project

CS-v4 LTc5:Access to quality transit
posted by  Martin Stowell  on 

For this credit, 'functional entry of the project' means from the project boundary or the actual building?

1
Tue Jan 17, 2017, 10:18 pm

Herbicides and Pesticides used during performance period

EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Management
posted by  Joseph Snider  on 

I am a bit confused about the use of herbicides and fertilizers for landscaped areas within the LEED boundary.

1
Mon Aug 28, 2017, 8:20 pm

Separate Storage Enclosure

NC-2009 PIf2:Project Summary Details
posted by  David Hryvniak  on 

I am working on a project that has a small, separate generator enclosure/ maintenance building. It is not connected to the building, and it is not conditioned or ventilated.

1
Sun Apr 17, 2016, 2:48 pm

NC-v4: Rainwater management

NC-v4 SSc4:Rainwater management
posted by  Hadar Farjo  on 

Our Project is part of a Campus. Can we use the campus(regional) pond located outside our project boundary to achieve the rainwater management points for our project? The initial pond will be des

1
Fri Jul 14, 2017, 2:40 pm

IEQ Credits 4.1-4.5 - applies to on-site application only?

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Charlie DeTillio  on 

We are semi-new to the LEED program and want to be sure that we are following all of the necessary guidelines to achieve the overall credits for the project.

1
Wed Mar 18, 2015, 2:35 am

Energy Metering

EBOM-v4 EAc5:Advanced energy metering
posted by  Zachary Hayes  on 

Is it acceptable to use energy monitoring software to meet this credit or does it need to be a physical meter?

1
Wed Jun 22, 2016, 5:02 pm

Church+Classrooms = Office?

EBOM-2009 EAc1:Optimize Energy Performance
posted by  Charles Shinneman  on 

I have a church that runs extended house 9am-10pm 6.5 days a week has classrooms that are not heavily occupied. In classifying it the occupancy looks more like an office with extended hours.

1
Sat Aug 26, 2017, 3:42 pm

existing site soils are impervious

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  emily reese moody  on 

Hello, I am fielding a question for our civil engineer.

1
Wed Jul 29, 2015, 8:18 pm

Does gravel count?

NC-v4 SSc3:Open space
posted by  Harvard University Green Building Services  on 

Does gravel count as vegetated open space where there are bushes and other plantings in the gravel area?

1
Tue Jan 17, 2017, 7:43 pm

Ice Makers on LEED 2009 for Retail NC

Retail-NC-v2009 WEc3:Water use reduction
posted by  Nic Millard  on 

Are ice makers included in the WE 3 calculations since its Retail NC, we thought they were excluded for NC all together, but were not sure if this only applied to NC schools and core and shell.

1
Sat Aug 26, 2017, 11:56 pm