Forum quick links
LEED EBOM 2009 IEQc3.1 Form
EBOM-2009 IEQc3.1:Green Cleaning—High-Performance Cleaning Programposted by Alicia Ravetto on
Can you help me locate the blank form (that does not say for reference only) to use in submitting an Innovation Credit?
Building with no FTE
NC-v4 LTc6:Bicycle facilitiesposted by Nathan Gauthier on
Has anybody proposed eliminating showers and / or long-term bike storage in a building with no FTE? We're renovating a small wood-frame classroom building with 8 classrooms.
Ventilation Effectiveness
posted by Dustin Balton on
I am working for a client who has a variable refrigerant HVAC system with a separate fully condition ventilator supplying fresh air.
Additions, Separate Utility Building, Campus Site
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Michele Helou on
I'm trying to verify an acceptable LEED Project Boundary for a LEED NC v3 project.
Complex projects benefit from turn-key waste mgmt services
Pilot-Credits MRpc69:Construction and demolition waste managementposted by Joanna Switzer on
The recently completed Dr.
Tenant Sub-Metering
CI-2009 EAc3:Measurement and Verificationposted by Donald Green on
Our tenant will have sub-meters installed on the lighting and HVAC electrical panels on each floor of their tenant space.
EA Credit 1 Optimise Energy Performance - reaching criteria
CI-2009 IDc1:Innovation in Designposted by Anna Brodersen on
Right now our project for an office building is en route to meeting the criteria of the updated LEED 2009 EA Credit 1 for optimising energy performance.
Location(s) and Wording of Signs
EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Haley Duncan on
I'd like a little more clarity on "posting information regarding the building's nonsmoking policy in prominent locations throughout the building." We are a winery with a production facility, offi
Existing Laboratory Equipment
CI-2009 EAp3:Fundamental Refrigerant Managementposted by Michele Helou on
Ok - consensus has been and reviewers have supported that existing base building HVAC and central plant systems are exempt from this prereq. Now, does anyone know if reused equipment - laboratory
EQc5 - Parking Garages
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Kristopher Lashley on
We have a multi story underground parking structure that is exhausted with 26,000cfm P1, 32,000 cfm for P2 and P3.