Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Document Upload

NC-v4 EQc6:Interior lighting
posted by  Boggarm Setty  on 

For V4, is there no requirement anymore to upload supporting documents? I don't see any upload buttons on the form itself.

1
Tue Aug 4, 2015, 2:43 pm

Use of Hycrete waterproofing admixture for Innovation credit

NC-2009 IDc1:Innovation in Design
posted by  Donna Juselis  on 

Our project is a mixed use redevelopment in a flood prone area. The first floor slab-on-grade on the project is located below the design flood elevation.

1
Fri Dec 16, 2016, 7:14 pm

LEED O&M for building additions

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Steve Gross  on 

I am in the process of documenting LEED O&M credits for a museum that is building an addition.

1
Fri Feb 24, 2017, 8:55 am

Addition To An Existing Certified Building

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Timothy VanOudenhoven  on 

I am currently working on a project where an existing certified building will have major renovation to the interior of the existing and an addition added to the existing certified building. There w

1
Mon May 18, 2015, 1:24 pm

LEED Selection - High Rise Residential

LEED Rating System Selection
posted by  Curt Pascoe  on 

I am working on a unique project. 30 story existing historic building, office.

1
Wed Mar 30, 2016, 1:08 pm

Detention Center Perimeter and Recreation Yard Security Lighting

NC-2009 SSc8:Light Pollution Reduction
posted by  Dranan Sparks  on 

I have a state owned youth detention center (jail) project in lighting zone LZ1.

1
Mon Jun 12, 2017, 4:02 pm

Master site credits

CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  charles bell  on 

We have three projects on a campus application. The master site submittal for this credit as well as others was approved during review.

0

Final Report

NC-v4 EAc1:Enhanced commissioning
posted by  Colin Grist  on 

Hello all, I am wondering if there are guidelines for what should be included in the eCx final report. Is there a template or list of items that should be included? Thank you, Colin

1
Tue Dec 13, 2016, 6:32 pm

93727 On-site & Off-site Ren. En. - RP for 6 Points if only Off?

EBOM-2009 RPc1:Regional Priority
posted by  Michelle Bracewell-Musson  on 

Hello, I know that a project can only earn Exemplary if 100% is off-set, however, it must be a COMBINATION of On-site and Off-site to earn EP.

1
Thu Mar 10, 2016, 4:03 am

TPO Roofing

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Celimar Fournier  on 

Are roofing materials part of this credit? Do I need to take into consideration the VOC Content of the TPO Bonding Ahesive, TPO Cut Edge Sealant, TPO Primer and the TPO Seam Cleaner?

1
Fri Mar 3, 2017, 6:06 pm