NC-v4 EQc6:Interior lightingposted by Boggarm Setty on
For V4, is there no requirement anymore to upload supporting documents? I don't see any upload buttons on the form itself.
Use of Hycrete waterproofing admixture for Innovation credit
NC-2009 IDc1:Innovation in Designposted by Donna Juselis on
Our project is a mixed use redevelopment in a flood prone area. The first floor slab-on-grade on the project is located below the design flood elevation.
LEED O&M for building additions
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Steve Gross on
I am in the process of documenting LEED O&M credits for a museum that is building an addition.
Addition To An Existing Certified Building
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Timothy VanOudenhoven on
I am currently working on a project where an existing certified building will have major renovation to the interior of the existing and an addition added to the existing certified building. There w
LEED Selection - High Rise Residential
posted by Curt Pascoe on
I am working on a unique project. 30 story existing historic building, office.
Detention Center Perimeter and Recreation Yard Security Lighting
NC-2009 SSc8:Light Pollution Reductionposted by Dranan Sparks on
I have a state owned youth detention center (jail) project in lighting zone LZ1.
Master site credits
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by charles bell on
We have three projects on a campus application. The master site submittal for this credit as well as others was approved during review.
Final Report
NC-v4 EAc1:Enhanced commissioningposted by Colin Grist on
Hello all, I am wondering if there are guidelines for what should be included in the eCx final report. Is there a template or list of items that should be included? Thank you, Colin
93727 On-site & Off-site Ren. En. - RP for 6 Points if only Off?
EBOM-2009 RPc1:Regional Priorityposted by Michelle Bracewell-Musson on
Hello, I know that a project can only earn Exemplary if 100% is off-set, however, it must be a COMBINATION of On-site and Off-site to earn EP.
TPO Roofing
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Celimar Fournier on
Are roofing materials part of this credit? Do I need to take into consideration the VOC Content of the TPO Bonding Ahesive, TPO Cut Edge Sealant, TPO Primer and the TPO Seam Cleaner?