Forum quick links
Preferred parking on surface lot or in garage structure
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Deborah Lucking on
First of all, thanks to all for the lively discussion on LI 10202 (April through Sep 2013).
RE: SSc5.1: It looks like a greenfield site but may not be???
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Joe Manganelli on
Hi All, I am working on a 200 acre site that looks like greenfield farmland.
Multi-family Mid-rise EA Pre-req 1 - Option 2
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Pournamasi Rath on
Hi, I have a quick question regarding LEED for Homes Multi-family Mid-rise EA Pre-req 1 - Option 2 (see reference document here - http://www.usgbc.org/sites/default/files/Energy%20and%20Atmosphere%
How to Apply Research Park Guidelines when Zoning is silent
CS-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Maggie Hogan Skaug on
A project pursuing LEED CS 2009 is located in a research park and is subject to the research park's design guidelines. Per city zoning, there is no requirement for open space.
Diverse Uses - Document Nearby Uses
CS-v4 LTc4:Surrounding density and diverse usesposted by Maria Fiorelli on
Previously in v2009, to document 'Community Connectivity' we would use a radius around our project on Google Earth, marking the diverse uses with icons.
Mixed Use, Mid Rise Residential, CO2 in units?
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Joanna Jenkins on
My firm has had success not including CO2 sensors in units of mid-rise residential project under LEED v3 NC.
Commercial Refrigeration Systems
EBOM-v4 EAc8:Enhanced refrigerant managementposted by Meier Corporate Account on
I would like some clarification on what LEED considers a commercial refrigeration system in regards to leak check reports. I have 2 different systems in my plant...
Policy Template - Maintenance Equipment "goals"
EBOM-v4 SSp1:Site management policyposted by Maureen Colburn on
In the Site Mgt Policy template for this prerequisite under the "goals" section for maintenance equipment, 3 options to select from are listed (limit grass, use only manual or electric equipment,
residential kitchen - spray nozzle
NC-2009 WEc3:Water Use Reductionposted by Erin Holdenried on
Regarding a residential kitchen sink that has a faucet and a spray nozzle, would the spray nozzle be measured against the baseline flow rate of a kitchen faucet or a pre-rinse spray valve?
R-Value for wall assembly
NC-2009 EAp2:Minimum Energy Performanceposted by Sunil S on
I am working on a residential building, the exterior wall assembly as R-19 fill cavity between studs for an 3.5" depth (wood studs 2x4 16" OC) but in the ASHRAE table A3.4, there is no value menti