choosing between CS and Hospitality
posted by GBD Architects on
Hi, we have a large project coming up that will be about 43% hotel and the rest CS.
Option 1 - how to account for a structural truss in the calcs
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Jeremy Knoll on
In our classrooms and other core learning spaces, we are leaving a concrete, pan joist system exposed.
Changes to Campus Boundary?
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by David Gibney on
It was recently brought to my attention that our Master Site (under the older "block" registration process) has changed since our original design intent.
Atypical Fixture on a Floor with 0 FTE
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Alexis Thompson on
I'd like some assistance on defining my fixture groups. My project has the same public lavs, water closets, and urinal fixtures throughout the building with very similar occupant usage patterns.
registering a project
NC-2009 MPR4:Must comply with minimum floor area requirementsposted by Megan Bove on
Good morning. I am trying to register a project that is 7,893.3 square feet.
Slab on grade and concrete piers
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by David Browne on
I have a large building with an arena at the second level. I am retaining the slab on grade on the first level except for some small cuts to run piping.
Addition to Existing Leed EBOM Building
posted by Max Neu on
Forgive me if this has been answered, I searched all over and can't find a definitive answer.
Regularly Occupied Space + Basement View Access
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Ryan Kurlbaum on
We are doing a zero-lot line project in NYC on a very narrow site.
residents of Multi-residential project
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Yan-Chuan Chen on
Hi All, I am working on a multi-residential building. However, the residents number should put based on the LEED Ref. Guide or on building code?
Is it OK to use different units of measurement for MRc6 + MRc7?
EBOM-2009 MRc6:Solid Waste Management—Waste Stream Auditposted by Craig Wilson on
A client had a waste audit done for MRc6 in weight (36% landfill diversion) and we analyzed MRc7 in volume (55% landfill diversion).