Group Project - WEp1 & WEc3
Healthcare-v2009 WEp1:Water use reductionposted by Emily Hope on
In group projects, the WEp1 form requires data to be submitted separately for each project building.
FTE and LEED boundary - LEED CI (v4)
posted by Anna de Anguera on
For LEED CI - this may be so obvious and that is why it is not actually stated anywhere - but I'm assuming that FTE's are calculated based on your LEED boundary, and excludes the rest of the buildi
OPTION 3 METHOD
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Tim Gaidis on
Hi there, we are working on a project in St John's, Newfoundland and was wondering: 1. For Option 3 does Car Sharing only mean renting cars (i.e.
LEED HC (major renovation) or CI (v4)?
posted by Heather Zeto on
I have a project that is undergoing discussion regarding which rating system to use. For all practical purposes, it is an interior fit-out of 4 floors of a hospital tower for a new unit.
Manufacturer Declaration Letter
NC-2009 MRc4:Recycled Contentposted by Rezkar Abdulmajeed on
We completed the design of our project in 2013 and start construction in 2014.
Can CARB’s ATCM 93120 (2008).
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Summer Gorder on
Can CARB ULEF (Ultra Low Emitting) composite wood ceiling tiles that meet ATCM 93120 (2008) comply with IEQ credit 4.4?
Planters
NC-v4 SSc3:Open spaceposted by Justin Halse on
Under LEED v4, do planters count as vegetated space? We are working on a project for a university and we are putting in planters.
Walking path question
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by Chris Miller on
Can our walking path that leads to the bus stops go through the buildings parking lot?
Adhesive- expansion joints
Schools-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Stephanie Santiago on
Quick question on how to classify epoxy adhesive for expansion joints: The product data from the vendor, Emseal, states the VOC is 100 g/l, now which VOC limit do I use since these joints will be
Functional entryway of project
CS-v4 LTc5:Access to quality transitposted by Martin Stowell on
For this credit, 'functional entry of the project' means from the project boundary or the actual building?