Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

LEED requirements for kitchens

NC-v4 EAp2:Minimum energy performance
posted by  Gabriela Mesquita  on 

What are the LEED certification requirements for an industrial kitchen/dining room?

0

Sidewalks width

ND-Plan-v4 NPDp1:Walkable streets
posted by  Gabriela Mesquita  on 

Hello, I have a query.
In the Walkable Streets Prerequisite, specifically at point C.

0

Requerimiento horario

Retail-NC-v4 SSc6:Light pollution reduction
posted by  Jorge Adalberto Bernal Segovia  on 

Existe algún requerimiento horario para el apagado y encendido de luces exteriores?

4
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Fri Jun 19, 2020, 1:53 pm

Hotel Survey

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Jorge Adalberto Bernal Segovia  on 

Good afternoon,
What is the way to carry out the surveys in a Hotel, where there are fixed staff and guests?

Thank you

0
1
Wed Jul 10, 2019, 9:00 pm
3
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Wed Jun 26, 2019, 8:54 pm