Forum quick links
Measuring Success
Pilot-Credits SSpc154:Heat Island Mitigation with Cool Wallsposted by Dulce Solis on
How have you evaluated the performance and effectiveness of cool walls in mitigating the urban heat island effect within your projects?
IN- GREEN BUILDING EDUCATION
CS-v4 INc1:Innovationposted by Dulce Solis on
Has anyone implemented the second strategy in the guide "The development of a manual, guideline or case study to inform the design of other buildings based on the successes of this project."?
Collected rainwater used for flush fixtures (toilets)
CS-v4.1 SSc4:Rainwater Managementposted by Sofía Rizo on
The new v4.1 requirements for credit Rainwater Management - option 1, state that "The percentile event volume must be retained (i.e.
IN - Heat Island Mitigation with Cool Walls
NC-v4.1 INc1:Innovationposted by Jorge Ramírez Hernández on
Greetings,
Home Office Projects
Pilot-Credits INpc136:Safety First: Re-Enter Your Workspaceposted by Mayela Saucedo on
To meet the requirements of the 'Re-Enter Your Workspace' credit, daily surveys are mandatory, covering aspects such as social distancing.
Biophilic Design as a Guiding Principle in Sustainable Design
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by Carla Roubaud on
Securing this credit goes beyond ticking boxes; it requires thoroughly blending natural elements into the architecture.
Occupant's survey
Pilot-Credits INpc136:Safety First: Re-Enter Your Workspaceposted by Dulce Solis on
My team would like to know if you would consider taking an approach in the occupant's survey where we keep track of their current health state.
TABLE 1. Default Occupancy Numbers
CS-v4 EQp1:Minimum indoor air quality performanceposted by Oscar Martinez on
Hi, I'm working on a warehouse project in Mexico. The rating system is v4 CS and I have a question in progress.