LEED Form MR 4

NC-2009 MRc4:Recycled Content
posted by  juan pena  on 

The assembly as % of product section found in the MR 4 form is already prefilled with 100% for all materials. Is this correct?

1
Sat Aug 26, 2017, 5:34 pm

Role

LEED for Homes (LEED-H) Forum
posted by  Gustavo De las Heras Izquierdo  on 

Who is responsible for reviewing project drawings, specs and calculations BEFORE submitting them to the builder: the QAD, the Green Rater or a LEED for Homes Consultant? Our experience outside the

1
Mon Nov 9, 2015, 2:41 pm

Existing Buildings

Pilot-Credits EQpc78:Design for active occupants
posted by  Rubén M. R.  on 

This pilot credit is an incentive for existing building owners to plan a renovation of unused stairs.

0

% of Glazing & Floor Area Base Case vs Project

CS-2009 EAp2:Minimum Energy Performance
posted by  Dana Guzman  on 

Hi, I am new to LEED and looking at the energy model submitted by our consultant for the compliance on EAp2. I have a basic question.

1
Fri Jun 17, 2016, 3:00 am

Demonstrate Savings for CRAC Units

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Gabriela Crespo  on 

Dear all, Same project as before, Central Chilled Water System, not in our scope. The only HVAC equipment in our scope are 2 CRAC units for the office's SITES.

1
Sat Aug 6, 2016, 6:33 pm

Paints Low Emissions

CI-v4 EQc2:Low emitting materials
posted by  Gabriela Mena   on 

Hi, We have a CI project in Mexico, we are specifying a National paints trade and the certification for VOC is the standard ASTM D 3960, which is not in the list of third party certifications acc

1
Sat Aug 26, 2017, 8:04 pm

LEED O&M on a portion of a building

EBOM-v4 MPR3:Must comply with project size requirements
posted by  LEED Pro Consultant  on 

Would a CI project (not LEED) that complies with the MPR's but consists of only a portion of a building (5 levels) be elegible for a LEED O&M certification?

1
Tue Jan 17, 2017, 6:05 pm

Exterior space, partially enclosed - Application of Std.

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Mauricio Ramirez  on 

Hello in a Museum, we have an uderground open space, that, on our understanding is an exterior space, as it is outside the Access vestibule.

1
Mon Jul 6, 2015, 10:20 pm

Wastewater

NC-2009 WEc3:Water Use Reduction
posted by  Alejandro Macias  on 

I m using the "water use reductions calculator" to document the WEp1 and WEc3. But in the project im working we will be reusing waste water for the WC and urinal flushing.

0

Pedestrian access - Community connectivity

CS-2009 SSc2:Development Density and Community Connectivity
posted by  Maria Isabel Conde  on 

Hello, Our C&S project is located within 1/2 mile radius of more than 10 basic services. There is pedestrian access between the building and the services.

1
Thu Dec 22, 2016, 10:40 pm