Forum quick links
LEED Form MR 4
NC-2009 MRc4:Recycled Contentposted by juan pena on
The assembly as % of product section found in the MR 4 form is already prefilled with 100% for all materials. Is this correct?
Role
posted by Gustavo De las Heras Izquierdo on
Who is responsible for reviewing project drawings, specs and calculations BEFORE submitting them to the builder: the QAD, the Green Rater or a LEED for Homes Consultant? Our experience outside the
Existing Buildings
Pilot-Credits EQpc78:Design for active occupantsposted by Rubén M. R. on
This pilot credit is an incentive for existing building owners to plan a renovation of unused stairs.
% of Glazing & Floor Area Base Case vs Project
CS-2009 EAp2:Minimum Energy Performanceposted by Dana Guzman on
Hi, I am new to LEED and looking at the energy model submitted by our consultant for the compliance on EAp2. I have a basic question.
Demonstrate Savings for CRAC Units
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Gabriela Crespo on
Dear all, Same project as before, Central Chilled Water System, not in our scope. The only HVAC equipment in our scope are 2 CRAC units for the office's SITES.
Paints Low Emissions
CI-v4 EQc2:Low emitting materialsposted by Gabriela Mena on
Hi, We have a CI project in Mexico, we are specifying a National paints trade and the certification for VOC is the standard ASTM D 3960, which is not in the list of third party certifications acc
LEED O&M on a portion of a building
EBOM-v4 MPR3:Must comply with project size requirementsposted by LEED Pro Consultant on
Would a CI project (not LEED) that complies with the MPR's but consists of only a portion of a building (5 levels) be elegible for a LEED O&M certification?
Exterior space, partially enclosed - Application of Std.
NC-2009 IEQp1:Minimum IAQ Performanceposted by Mauricio Ramirez on
Hello in a Museum, we have an uderground open space, that, on our understanding is an exterior space, as it is outside the Access vestibule.
Wastewater
NC-2009 WEc3:Water Use Reductionposted by Alejandro Macias on
I m using the "water use reductions calculator" to document the WEp1 and WEc3. But in the project im working we will be reusing waste water for the WC and urinal flushing.
Pedestrian access - Community connectivity
CS-2009 SSc2:Development Density and Community Connectivityposted by Maria Isabel Conde on
Hello, Our C&S project is located within 1/2 mile radius of more than 10 basic services. There is pedestrian access between the building and the services.