Forum quick links
Non-certified buildings in LEED boundary
NC-v4 MPR2:Must use reasonable LEED boundariesposted by marty seese on
I have a project that is all new construction. There are 3 buildings on the site. The main building which is what the owner wants to be LEED Certified. Another building is a shed building.
NC & CI projects
Pilot-Credits WEpc110:Water Restoration Certificates®posted by Sheryl Swartzle on
I found the purchasing process for Water Restoration Certificates to be very easy with BEF. The benefits are easily understood by the clients and on our CI project the cost was very reas
HVAC Background Noise - sound rating methods
NC-v4.1 EQc9:Acoustic Performanceposted by Iris Meeker on
For the HVAC Background Noise, do all spaces have to use the same Sound Rating Method (NC/RC, dBA, dBC, RC(N)), or can these vary by individual space or by space type?
Interpretation of text relating to Envelope
NC-v4 EAp1:Fundamental commissioning and verificationposted by Keith Fahy on
Hi, see here an extract from the Reference Guide: "The envelope must be covered in the OPR and BOD, but full envelope commissioning is not required unless the project team pur
Disinfectants with EPA Registration No. and on List N: Disinfectants for Coronavirus (COVID-19)
EBOM-v4 EQc7:Green cleaning - products and materialsposted by DINGTIAN OU on
Few green disinfectants (e.g. Green Seel, UL or EPA Safer Choice Standard certified) are available in Hong Kong market.
Our clients proposed two commonly used disinfectants:
Roof Typology
Hospitality-NC-v4.1 SSc5:Heat Island Reductionposted by Francesco Lupoi on
Hi everyone,
District cooling chilled water
CS-v4 WEc2:Indoor water use reductionposted by Dina El-Sady on
If the project is served by a district cooling plant outside LEED project boundary , does the chilled water count as process water and needs to be included in water efficiency calculations?
WEpc115 & CBECS data
Pilot-Credits WEpc115:Whole Project Water Use Reductionposted by Steve Loppnow on
We found that CBECS data was more conservative than the metered water use for kitchen areas from comp projects in the portfolio.
All-Gender Restrooms - Verticality (Locate on all levels or selected levels?)
NC-v4 INc1:Innovationposted by Vijitha Mammen on
We are working on a post-secondary education project incorporating both gendered and all-gender restrooms.