Forum quick links
Purchasing Lamps Innovation Credit for ID+C commercial interior project
CI-v4 INc1:Innovationposted by Émilie Cormier on
Hi,
Defining Minimum Scope of Work of MBCx to Optimize the Investment Cost for The Building Owner
CS-v4 EAc1:Enhanced commissioningposted by Titinant on
Referring to LEED V4 EAc1 guideline, MBCx is the integration of 3 components: (1) Permanent energy monitoring systems, (2) Real-time energy analysis, (3) Ongoing commissioning.
Battery operated task light
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Noriko Nagazumi on
Hi,
Is battery operated task light acceptable to meet the credit task light requirement?
Thank you!
Anyone here affected by the extension of the v3 sunset date to June 2022?
posted by Nadav Malin on
I just saw the announcement that the sunset date for LEED v3/v2009 was extended, and you now have u
Residential or nonresidential?
CS-v4 LTc4:Surrounding density and diverse usesposted by Patricia Brezny on
How are these classified for calculating surrounding density? Dormitories? Hotels?
Which buildings need to be modeled?
ND-Plan-v4 GIBp2:Minimum building energy performanceposted by Tim Nabholz on
Hi All,
The following is noted in the reference guide after Option 2:
LEED version 2009 Sunset admist COVID-19
posted by Rodolfo Loro, Jr. on
Hello to all! I hope for everyone's safety and health during these uncertain times.
Minisplit Efficiency
NC-2009 EAp2:Minimum Energy Performanceposted by Paula Hernandez on
Hi
I am certifiying an office building, a very small one, attached to a wharehouse.