Gas metering

EBOM-2009 EAc3.2:Performance Measurement—System-Level Metering
posted by  Oana Stamatin  on 

In our office building, the annual Gas Consumption accounts for more than 40% of the total annual energy consumption. The gas is used for Heating and for Cooking (for a Restaurant).

5
LEED AP BD+C
Colliers International
LEEDuser Basic Member
1 thumbs up
Wed Apr 9, 2014, 10:40 am

3 floors + Attic: LEED Homes or LEED NC?

LEED Rating System Selection
posted by  Mario S.  on 

Good day, I have a residential development project outside the U.S which consists of several low-rise buildings of 3 stories + Attic (3rd floor hence consists of a duplex).

8
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Apr 9, 2014, 7:30 am

To weigh, or not to weigh?

NC-2009 MRc2:Construction Waste Management
posted by  Lawrence Lile  on 

We have a project with some existing asphalt pavement that will be busted up and used as clean fill on the same project.

2
Senior Project Manager
Zinner Consultants
LEEDuser Basic Member
110 thumbs up
Wed Apr 9, 2014, 1:24 am

Data Centers in LEED v3 - exceptional calculation method?

NC-2009 EAp2:Minimum Energy Performance
posted by  Jeremy Rapoza  on 

I have a relatively large data center (200kw connected load) in a relatively larger building (250k sf) so that the data center is not the major program space, but is a relatively large minority of

3
Default Avatar
Engineer
Tighe & Bond
LEEDuser Basic Member
7 thumbs up
Tue Apr 8, 2014, 8:18 pm

Changing the Timeline

Living with LEED Online - quirks, bugs and hiccups
posted by  Charles Nepps  on 

After uploading an considerable amount of credit data (but not submitted for review), I noticed that the project is set up to have a split review.

5
NH Green Consulting
LEEDuser Premium Member
80 thumbs up
Tue Apr 8, 2014, 4:34 pm

Catch

NC-2009 EAc6:Green power
posted by  Jean Marais  on 

Are there any catches to proving that the RECs that we buy are used only on a specific LEED project? Should I ask the seller to specify the facility's name or something on the REC?

5
Tue Apr 8, 2014, 3:35 pm
7
Principal
The Beck Group
LEEDuser Basic Member
98 thumbs up
Tue Apr 8, 2014, 2:59 pm

Complex Credit Definition

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Kristen Dotson  on 

I've clicked on all the links that have been posted in this blog in hopes of finding the list of "complex credits" but I haven't seen anything. The link on the GBCI website is broken.

3
Sustainability Professional
Bright Green
LEEDuser Basic Member
31 thumbs up
Tue Apr 8, 2014, 6:34 am

How can we get feedback on the pilot credit?

Pilot-Credits SSpc82:Local food production
posted by  Heather DeGrella  on 

I am wondering if anyone who has posted has been able to get feedback any other way? I tried submitting my same question via LEEDonline and have received no response.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Apr 7, 2014, 11:03 pm

Fixture Replacement

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Patrick Salmon  on 

Our project will be pursuing the thirty percent (30%) savings threshold by including fixtures both within and outside the LEED project boundary.

5
Mon Apr 7, 2014, 6:44 pm