Sediment Basin dimensioning
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Paula Hernandez on
Hi, this may be a silly question. When dimensioning a temporary sediment basin, the CGP says to use either the calculations for the 24 hs- 2 year desing storm or 3600 cubic feet x acre drained.
Performance period timing
EBOM-2009 MRc9:Solid Waste Management—Facility Alterations and Additionsposted by Kim Wajda on
If performance periods for different credits have to end within the same 30 day period, and our solid waste was hauled and tracked during the period of the project's additions and alterations, this
Building Facade lighting - ASHRAE Baseline values
NC-2009 EAp2:Minimum Energy Performanceposted by Maya Karkour on
Dear All, I'm looking at Table 9.4.5 of ASHRAE 90.1-2007 which lists the maximum allowable LPDs for building exteriors.
Furniture Cost
CI-2009 MRc5:Regional Materialsposted by Morteza Kasmaei on
In a LEED-CI project, can we attempt for MRc4, MRc5, and MRc7 but not included cost of furniture in the calculator? It means that the furniture is not included in any of the LEED-CI credits.
Semi-permanent streams
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Paula Hernandez on
Our project has a very small semi-permanent stream runing through it (i.e., the streams forms only in heavy rainfalls). .
documentation guidance updated
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by Tristan Roberts on
LEEDuser has had a lot of comments from you that documenting this credit was confusing, particularly when environmental practices aren't employed 100% of our time.
Energy modeling of an open roof stadium in a hot climate
NC-2009 EAp2:Minimum Energy Performanceposted by Mario S. on
Good day, I have the following question regarding the energy modeling of a very large soccer stadium in a hot climate: My proposed design involves floor mounted and side mounted jet fans that are
SSpc14 Walkable project Site
Pilot-Credits PC14:Walkable Streetsposted by Amanda Johnson on
I am trying to register for this Pilot Credit (which is not listed as closed) Both LEED Online and LEED User link to the USGBC Credit Library, but in the credit Library I find no link to register.
Developement on EAp2?
posted by Jean Marais on
Are there any plans to do the same sort of thing with EAp2?
Actual Material Cost vs. Material Cost: what's the difference?
NC-2009 MRc4:Recycled Contentposted by Marcio Alberto Casado Pereira on
We received a review comment regarding credits MRc4 and MRc5 of a stadium we are working on in Brazil.