Forum quick links
LEED v4 Heat Island Reduction - include elevator shafts and stairwell enclosures in roof calcs?
NC-v4 SSc5:Heat island reductionposted by Julie Baines on
Hi all, I am working on a major renovation of an existing downtown campus building. The entire roof of the building is being redone with white TPO.
Location of outside airflow measuring station inside the HVAC unit
CI-v4 EQp1:Minimum indoor air quality performanceposted by Edgar Arevalo on
We have a 100% outside air HVAC with an energy recovery wheel serving the entire the project space. Since there is no recirculating air getting reintroduced to the supply side, the MEP engine
Runoff calculation - typical values for infiltration loss
NC-v4 SSc4:Rainwater managementposted by G.J. Teunissen on
Hi,
What are the standard values for the infiltration losses in the equation below for rainwater management credit? eg: previous pavements and vegetated roof.
Pharmacy Mail Order | Buy Xanax Without Rx - Medz Here Drugstore
posted by Benjamin Phelps on
Xanax is a type of medication used to treat mental health conditions such as anxiety, depression, or panic disorder.
How to claim "NC-v4 EAc3 - Advanced energy metering" credit for Villas
NC-v4 EAc3:Advanced energy meteringposted by QUANG DOAN on
Before diving deep into the question, to gain more insight into the project, please read the following overview:
Australian Ban on Engineered Stone and Silica Dust
posted by Douglas Flandro on
Are your firms discussing the health effects of silica dust on people working with engineered stone and the recent announcement of the upcoming ban in Australia, as of July 2024?
Option 2 Path 1 - any experience to share?
NC-v4.1 LTc3:High Priority Site and Equitable Developmentposted by Emily Purcell on
Hi LEED users! We had a thread in this forum back in 2022 about Option 2 Path 1, with a lot of good ideas for how to potentially earn the credit.
Call for nominations to the steering committee
posted by Candace Pearson on
Hello SCL members,
One Tenant - two spaces across a public corridor - can this be certified as one project?
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Helen Kessler on
The tenant is located in a large multi-tenant building and has two leased spaces which are separated by a public corridor. Seems to me this is no different from a tenant that is on multiple l
Seeking Advice on Best Practices for Using Tally
posted by Patrick Donnelly on
Hey there, Tally users. I'm looking for some answers to a few basic questions about using Tally: