Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

LEED v4 Heat Island Reduction - include elevator shafts and stairwell enclosures in roof calcs?

NC-v4 SSc5:Heat island reduction
posted by  Julie Baines  on 

Hi all, I am working on a major renovation of an existing downtown campus building. The entire roof of the building is being redone with white TPO.

9
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Thu Jan 4, 2024, 6:20 pm

Location of outside airflow measuring station inside the HVAC unit

CI-v4 EQp1:Minimum indoor air quality performance
posted by  Edgar Arevalo  on 

We have a 100% outside air HVAC with an energy recovery wheel serving the entire the project space.  Since there is no recirculating air getting reintroduced to the supply side, the MEP engine

0

Runoff calculation - typical values for infiltration loss

NC-v4 SSc4:Rainwater management
posted by  G.J. Teunissen  on 

Hi,

What are the standard values for the  infiltration losses in the equation below for rainwater management credit? eg: previous pavements and vegetated roof. 

0

Pharmacy Mail Order | Buy Xanax Without Rx - Medz Here Drugstore

SITES Discussion Forum
posted by  Benjamin Phelps  on 

Xanax is a type of medication used to treat mental health conditions such as anxiety, depression, or panic disorder.

0

How to claim "NC-v4 EAc3 - Advanced energy metering" credit for Villas

NC-v4 EAc3:Advanced energy metering
posted by  QUANG DOAN  on 

Before diving deep into the question, to gain more insight into the project, please read the following overview: 

1
Fri Jan 5, 2024, 3:44 pm

Australian Ban on Engineered Stone and Silica Dust

SD Leaders
posted by  Douglas Flandro  on 

Are your firms discussing the health effects of silica dust on people working with engineered stone and the recent announcement of the upcoming ban in Australia, as of July 2024?

5
Default Avatar
Principal
Goody Clancy
LEEDuser Basic Member
0 thumbs up
Wed Jan 3, 2024, 10:39 pm

Option 2 Path 1 - any experience to share?

NC-v4.1 LTc3:High Priority Site and Equitable Development
posted by  Emily Purcell  on 

Hi LEED users! We had a thread in this forum back in 2022 about Option 2 Path 1, with a lot of good ideas for how to potentially earn the credit.

1
Fri Mar 15, 2024, 9:46 pm

One Tenant - two spaces across a public corridor - can this be certified as one project?

CI-v4 MPR2:Must use reasonable LEED boundaries
posted by  Helen Kessler  on 

The tenant is located in a large multi-tenant building and has two leased spaces which are separated by a public corridor.  Seems to me this is no different from a tenant that is on multiple l

4
President
HJKessler Associates
LEEDuser Basic Member
41 thumbs up
Wed Jan 3, 2024, 1:25 pm

Seeking Advice on Best Practices for Using Tally

Green Commons
posted by  Patrick Donnelly  on 

Hey there, Tally users.  I'm looking for some answers to a few basic questions about using Tally:

5
Vice President
Moseley Architects
LEEDuser Premium Member
10 thumbs up
Wed Jan 3, 2024, 1:01 am