Schools-2009 EAp2:Minimum energy performanceposted by Ameet AA on
Following requirement is stated even in the LEED 2009 School Alternative compliances path for project outside the U.S.(July 2012) "The project must establish an energy performance rating goal for
Part Residence and Part Office
NC-2009 EAp2:Minimum energy performanceposted by April Ambrose on
I have a small facility (20k sqft or so) that is approximately 45% office and 55% "transitional" residential. I've modeled it as a residential with PTAC w/ HW Coil per zone, but I'm running into a
EAc5 Option 3
NC-2009 EAc5:Measurement and verificationposted by Crina Bosch on
We have a large project that is on a DES - We meet the criteria that forces us to include upstream DES equipment.
1/2 a Mile walkable distance evidence/survey
NC-2009 SSc2:Development density and community connectivityposted by Lorne Mlotek on
Hi Everyone, A little bit of an obscure question in regards to community connectivity. I was wondering if anyone knew how USGBC chose 1/2 mile to be considered a walkable distance.
Irrigation efficiency for manual watering
EBOM-2009 WEc3:Water efficient landscapingposted by Alicia Villanueva on
The Reference Guide does not state the irrigation efficiency for manual watering, just for drip and sprinkler irrigation.
Mixed use projects
posted by Amanda Johnson on
Hello, We have several mixed use projects underway in France (one retail, office, hotel and one workshop and office space).
No new parking VS local regulations
NC-2009 SSc4.4:Alternative transportation - parking capacityposted by Mike D on
We are targeting SSc.4.4-Alternative Transportation-Parking Capacity for a New Construction project. The project will not provide any parking.
LEEDv4 EBOM comments
posted by Lyle Axelarris on
Is this where I should comment on LEEDv4 EBOM changes? Also, I'm not sure where the best place is to post this comment, but there is an error in the new EBOM checklist.
EAP2 & IEQp1 Denied - Appeal or clarify credit or modify design?
posted by RICHARD CUEBAS on
1. Our Design Final Review response denied both EAp2 & IEQp1.
SSc4.2 components in renovated existing building
NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by Jeremy Theodore on
From the text in MPR3, it seems plausible that bike parking and showers used to meet credit SS4.2 could be built by renovation in another in another facility outside the project's LEED scope, as lo