Walk off mats for skyway entrance
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by SIG - Sustainability Main Account on
Would a skyway, those elevated walkways between buildings popular in Minneapolis, be considered a "regularly used exterior entrance", thus require a walk off mat?
Storage location
NC-v4 MRp1:Storage and collection of recyclablesposted by Maiz Rech on
Is there a minimum distance or positioning requirement for this area?
Would it be a problem to locate the recyclables storage on the building underground floor?
Invite to share your experience on integrating passive design and sustainability into projects
posted by Mike Fowler on
Please see the following invite from Professor Alexandra Rempel at the University of Oregon to participate a 15-20 minute phone/Zoom interview and share your experience and/or perceptions on t
IRA 179D and more
posted by Simona Fischer on
A couple questions for this group. I know we're having a Green Commons meeting on this next week. But can anyone comment on the following questions?
Buildings within site but not under LEED scope
NC-v4 EQp2:Environmental tobacco smoke controlposted by Marwa Elzoghby on
I have a project where the driver room and canteen, situated at the main gate, are not part of the LEED scope.
With Trace 700 going the way of the dinosaurs, what are you transitioning to?
posted by Kim Shinn on
If your HVAC designers are addicted to the crack that is Trace 700, and knowing that Trane is giving up on that product in the coming year, what loads program are you weaning* them onto?
Gross Floor Area
CI-v4 MPR3:Must comply with project size requirementsposted by Edgar Arevalo on
For a LEED Commercial Interior fit-out project, when we are registering the project in LEED Online it asks for the gross square footage. Since gross floor area also includes the exterior wall
Exterior Illuminated Signage
EBOM-v4 MRc2:Purchasing - lampsposted by Kristina K on
Hello,
Does this credit apply to Exterior Illuminated Signage?
Thank you
Total Material Cost
posted by Arda Buyuklu on
Why is providing Total Material Cost required/necessary when completing a LEED v4.1 Materials Reporting Form?
Multi-building project - installing renewables on only 1 building
CS-v4 EAc5:Renewable energy productionposted by Shannon Oletic on
We have a multi industrial building project (3 buildings) registered through a Campus Approach (as opposed to Group approach).