NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Keith Amann on
A project is considering using electrostatic filters in lieu of media-based filters (typically measured in MERV).
Selecting a rating system LEED CI or NC?
posted by Ali Kopyt on
I have a two part question. I’m working on a project where a university purchased a large complex of buildings that are all interconnected.
Landscape Over Underground Parking Garage
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Omer Moltay on
In one project we are working on with multiple buildings sharing hardscape pedestrian plaza areas located on a common parking garage base, landscaping will be installed above the parking garage are
Parking spaces for sale
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Ilana Judah on
We are working on a residential condominium project where below ground parking "spaces" will be sold separately from the units.
Epoxy Flooring Again
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Mary Kay on
I have a product by Sherwin-Williams "Tile-Clad High Solids" w/ a VOC of 374 g/l.
'Expected Volume for the Building' Question
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Rebekah Burke on
How do we address the expected volume of recycling for the building question? This is a question we received recently on a design review, and I'm not certain how to address.
DES Baseline
NC-2009 EAp2:Minimum Energy Performanceposted by SUNG SU KIM on
For HVAC System, Our project team will apply to 2 absorption chillers and geo-exchange heat pump.(project site is located in DES) In this case, we know that the baseline system of HVAC is absorpti
Consistency, Consistency, Consistency
posted by April Ambrose on
I think my main issue with this announcement is the lack of consistency in the way that USGBC/GBCI is making these decisions and announcements.
Speculative Project - Tenant Lease Upload
posted by Zachary Guren on
Our LEED Core & Shell project is a retail building that will have multiple tenants, but it is a speculative project (as we indicate at the top of the second page of PI Form 3).
Design for Adaptability
Pilot-Credits PC34:Design for Adaptabilityposted by Jeffrey Lewis on
As a Senior Building, this credit was pretty much a given.