Forum quick links
Which Energy Price for a project outside the US
NC-2009 EAc1:Optimize Energy Performanceposted by Tatjana Ernst on
Hi everyone, i am wondering if we can use the energy prices from the eia.doe.gov (US-Prices) although our project is in Europe? We don´t really understand the Site 273 of the Reference Guide.
Nice addition to the site
posted by Eric Johnson on
You're not charging enough. Way to increase the value of being a subscriber.
non-Cooling tower thinking
EBOM-2009 WEc4:Cooling Tower Water Managementposted by Jean Marais on
How does the line of thought go that balances out not using cooling towers (e.g. air cooled chillers)? Is it bad to not use a cooling tower? is it good? does it balance out in the energy points?
LEED boundary and materials scope
NC-2009 MRc4:Recycled Contentposted by Janika McFeely on
A project we're working on is replacing some of the city sidewalk, which is outside our property line and LEED boundary. Should we include the concrete in our material calculations?
WEp1 - Substantial Completion Date
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by susan eguia on
As per WEp1 requirement, the water use baseline is set depending on the year of substantial completion of the building indoor plumbing system.
just what I needed!
posted by Crystal Brokaw on
This addition was so timely for our project. We just switched from LEED-NC to LEED-CI, but USGBC has not officially swtiched us on LEEDOnline so we do not have access to the templates yet.