Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

LEED For Schools 2007 discrepancy

Schools-2009 SSc10:Joint Use of Facilities
posted by  Esmeralda Ward  on 

This question concerns the LEED for Schools 2007 Rating system. In the reference guide, the Option 1 compliance path does not include Joint parking areas as one of the spaces that could contribute

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon May 5, 2014, 4:56 pm

Furniture documentation

NC-2009 MRc4:Recycled Content
posted by  Nouran Abdel-Rahman  on 

Can I add the total cost of furniture, and consider it as one item in the LEED form?

4
Mon May 5, 2014, 4:10 pm

No water use

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Henrique Mendes  on 

What happens if we are working on a project that has no water use. No fixture or fittings... How to comply with the prerequisite? Or does that mean that this project is not elegible for LEED?

3
Director
LEAD Consultancy Engineering Services
LEEDuser Premium Member
0 thumbs up
Mon May 5, 2014, 3:54 pm

NC Boundary - campus control

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Phillip Cook  on 

I am working on a building on a hospital campus.

2
Mon May 5, 2014, 3:17 am

Final Design Review - Language issue

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Gaston Michaud  on 

We just received the response of the final design review and the Enhanced Commissioning Credit was denied since the contract that describes the scope of work and the completion date is in Spanish.

9
Sun May 4, 2014, 4:13 am

Modeling buildings w/ no proposed cooling; Workaround?

NC-2009 EAc1:Optimize Energy Performance
posted by  Jason Chenard, PE  on 

On Sept 12, 2012 there was a thread: "Proposed model, CAV system without cooling system". It references a "high temperature set point work around".

3
Sr. Mechanical Engineer
Oak Point Associates
LEEDuser Basic Member
1 thumbs up
Sat May 3, 2014, 11:01 pm

intensive vs. extensive green roofs

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Davis Kantor  on 

My recent research shows that installing a green roof system on a project aimed at LEED certification has the potential to contribute to the following LEED credits: SS 5.1 Site Development - Prote

6
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Sat May 3, 2014, 8:47 pm

Locker and Shower room

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Jackson .  on 

We working on a project that has shower and lockers room for their employees. does both area need to meet the prerequisite requirement in term of OA intake?

5
Fri May 2, 2014, 2:09 pm

ASHRAE 62.1 2007 locker room vs locker/dressing room

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Noriko Nagazumi  on 

Hello. I'm confused with two items on table 6-4: "Locker/dressing rooms" and "Locker rooms". The later requires twice the exhaust rate of the first item.

3
Fri May 2, 2014, 1:52 pm

LEED for HealthCare 2009: International Projects

LEED Rating System Selection
posted by  Maya Karkour  on 

Hi All, Does someone know if LEED for HealthCare 2009 is available for International Projects? Thanks a lot,

4
Fri May 2, 2014, 8:16 am